My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-28_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2006-02-28_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:02:33 PM
Creation date
11/23/2007 6:47:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
2/28/2006
Doc Name
Proposed Decision & Findings of Compliance for PR2
From
Change Mine Plan
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STIPULATION N0.14 <br />APPROVAL OF MINOR REVISION NO. 13 FOR THE YOAST MINE IS CONDITIONED UPON <br />THE RESOLUTION OF WEST VIRGINIA CESSATION ORDER NO. 13 ASSOCIATED WITH <br />PERMIT NUMBER E012500 FOR THE MARTINKA COAL COMPANY. PROOF OF <br />RESOLUTION SHOULD BE SUBMITTED TO THE COLORADO DIVISION OF MINERALS <br />AND GEOLOGY AS SOON AS IT BECOMES AVAILABLE. <br />STATUS: Complied with 10/17/2002. West Virginia Cessation Order No. 13 was resolved and <br />the stipulation was terminated. <br />STIPULATION NO. 15 <br />WITHIN 180 DAYS OF PERMIT REVISION NO.1 APPROVAL AND PRIOR TO <br />CONSTRUCTION OF POND 14, THE APPLICCANT SHALL SUBMIT A TECHNICAL <br />REVISION TO THE YOAST PERMIT WHICH DEMONSTRATES THAT POND 14 <br />EMBANKMENT HAS A MINIMUM STATIC SAFETY FACTOR OF I.S. THE STRENGTHS OF <br />MATERIALS MUST BE DETERMINED, AND AN ANALYSIS WITH SITE-SPECIFIC <br />STRENGTH PARAMETERS DEMONSTRATE A MINIMUM FACTOR OF SAFETY OF 1.5. <br />STATUS: Complied with 07/05/2000. Stipulation No. 15 has been satisfied by approval of TR- <br />14. <br />STIPULATION NO. 16 <br />THE CONSTRUCTION OF HAUL ROAD "D" BETWEEN POND 012 AND HAUL ROAD "B" <br />EXTENSION HAS BEEN COMPLETED. AS SOON AS WEATHER PERMITS BUT NO LATER <br />THAN JULY 1, 2001, SENECA COAL COMPANY MUST SUBMIT THE AS-BUILT <br />CERTIFICATION FOR THE PORTION OF HAUL ROAD "D" THAT HAS BEEN <br />CONSTRUCTED TO DATE. <br />STATUS: Complied with 07/30/2001. Stipulation No. 16 has been satisfied by approval of TR- <br />17. <br />STIPULATION NO. 17 <br />SCC WILL SUBMIT 3 COPIES OF PAGE 16, TABLE 22-5, VOLUME X, TAB 22 FOR FIELD <br />MINOR REVISION #17 BY APRILI8, 2002. <br />STATUS: Complied with 03/21/2002. Stipulation No. 17 has been satisfied by approval of <br />MR-17. <br />You[ Mine 6 Febmary 28, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.