My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-28_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2006-02-28_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:02:33 PM
Creation date
11/23/2007 6:47:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
2/28/2006
Doc Name
Proposed Decision & Findings of Compliance for PR2
From
Change Mine Plan
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. A MONITORING SYSTEM TO VERIFY THESE PROJECTIONS. <br />STATUS: Complied with 10/15/99. StipulationNo. 9 has been satisfied by approval ofPR-O1. <br />STIPULATION NO. 10 <br />NO SURFACE COAL MINING OPERATIONS SHALL BE CONDUCTED ON FEDREAL LEASE <br />C-0114093 UNTIL THE SECRETARY OF THE INTERIOR HAS APPROVED THE MINING <br />PLAN. THE DIVISION RESERVES THE RIGHT TO MODIFY THE PERMIT, WHEN <br />APPROPRIATE, IN ORDER TO RESOLVE CONFLICTS BETWEEN THE PERMIT <br />REQUIREMENTS AND THE REQUIREMENTS OF OTHER LAWS, RULES, AND <br />REGULATIONS ADMINISTERED BY THE SECRETARY OF THE INTERIOR. <br />STATUS: Complied with. Stipulation No. 10 has been satisfied by the approval of the federal <br />mining plan on 09/06/95. <br />STIPULATION NO. 11 <br />PRIOR TO INSTALLATION OF DRAGLINE DEADHEAD RAOD PERMANENT DRAINAGE, <br />SENECA COAL COMPANY SHALL CONSTRUCT KEY CUTS ABOVE AND BELOW THE <br />RECONSTRUCTED DRAINAGE TO THE MINIMUM SPECIFICATIONS OF 3' DEEP AND 5' <br />ACROSS THE WIDTH OF THE CHANNEL. SCC SHALL ALSO PLACE A GRANULAR <br />FILTER LAYER OR GEOTEXTILE FILTER FABRIC IN THE ENTIRE RECONSTRUCTED <br />DRAINAGE CHANNEL PRIOR TO PALCEMENT OF THE ROCK RIPRAP. <br />STATUS: Complied with. Stipulation No. 11 was satisfied by construction of the required <br />drainage amendments and approved on inspection on 01/15/97. <br />STIPULATION NO. 12 <br />SENECA COAL COMPANY SHALL SUBMIT A RECLAMATION PLAN IN THE FORM OF A <br />REVISION FOR THE TOPSOIL PILES LOCATED AT THE YOAST MINE ENTRANCE HAUL <br />ROAD BY OCTOBER 15, 1996. <br />STATUS: Complied with 05/30/97. This stipulation was satisfied by the use of the topsoil and <br />elimination of the pile in February 1997, and by approval of TR-O5. <br />STIPULATION NO. 13 <br />SENECA COAL COMPANY SHALL PROVIDE PROOF OF RESOLUTION OF KENTUCKY <br />CIVIL PENALTY VIOLATIONS AND BOND FORFEITURE ASSOCIATED WITH PERMIT <br />8980140 AS SOON AS IT BECOMES AVAILABLE. <br />STATUS: Complied with 10/17/2002. Kentucky violations associated with permit #8980140 <br />were resolved and the stipulation was terminated. <br />Yoast Mine 5 February 28, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.