My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-28_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2006-02-28_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:02:33 PM
Creation date
11/23/2007 6:47:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
2/28/2006
Doc Name
Proposed Decision & Findings of Compliance for PR2
From
Change Mine Plan
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATUS: Complied with. All of the permits listed above have been submitted and the <br />stipulation has been satisfied. <br />STIPULATION N0.2 <br />PRIOR TO CONSTRUCTION OF POND 11, SENECA COAL COMPANY MUST SUBMIT <br />ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE BOND <br />AMOUNT MUST BE APPROVED BY THE DIVISION. <br />STATUS: Complied with 01/18/96. Stipulation No. 2 has been satisfied bysubmittal ofTR-02. <br />STIPULATION NO. 3 <br />PRIOR TO CONSTRUCTION OF TOPSOIL PILE F, SENECA COAL COMPANY MUST <br />SUBMIT ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE <br />BOND AMOUNT MUST BE APPROVED BY THE DIVISION. <br />STATUS: Complied with 10/21/97. Stipulation No. 3 was satisfied by the submittal of MR-11, <br />which eliminated Topsoil Pile H and transferred the bonding liability associated with Pile H to Pile F. <br />STIPULATION NO.4 <br />PRIOR TO RETENTION OF THE YOAST HAUL ROAD AS PART OF THE POST MINING <br />LAND USE, A SIGNED CONSENT FORM FROM MANEOTIS SHEEP COMPANY MUST BE <br />SUBMITTED TO THE DIVISION. <br />STATUS: Complied with. Stipulation No. 4 has been satisfied by the submittal of a signed <br />consent form dated 05/08/96, now contained within the permit document. <br />STIPULATION NO. 5 <br />WITHIN 180 DAYS OF PERMIT ISSUANCE AND PRIOR TO CONSTRUCTION OF POND 11, <br />THE APPLICANT SHALL SUBMIT A TECHNICAL REVISION TO THE YOAST PERMIT <br />WHICH DEMONSTRATES THAT POND 11 WILL BE LOCATED AS NEAR AS PRACTICABLE <br />TO THE DISTURBED AREA, AND THAT THE POND EMBANKMENT HAS A MINIMUM <br />STATIC SAFETY FACTOR OF 1.3. <br />STATUS: Complied with 07/28/97. Stipulation No. 5 has been satisfied, the location acceptance <br />was documented in a letter dated 03/03/97 and the static safety factor requirement was satisfied by <br />approval of TR-06. <br />STIPULATION NO. 6 <br />WITHIN SIXTY DAYS OF PERMIT ISSUANCE, THE APPLICANT SHALL SUBMIT A <br />TECHNICAL REVISION TO THE YOAST PERMIT ADDING A SURFACE WATER <br />Yoast Mine 3 February 28, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.