Laserfiche WebLink
<br />of Federal Regulations and are regulations that are in effect on the date that this Permit becomes <br />effective. <br />**~ <br />PART II. SPECIFIC PERMI'~[' CONDITIONS <br />~~* <br />D. MONITORING, RECORD IS:EEPING, AND REPORTING OF <br />RESULTS <br />The Permittee is refit uired to cam out the activities described in the monitoring plan. The <br />data must be reported and maintained as provided in Section II D.4 of the Permit. The 4`n <br />Revision of the Water Monitoring Pl<ui, dated December 23, 1999, has been incorporated <br />into the Permit as Appendix I. <br />The Water Monitoring Plan includes ground-water monitoring, for the Piceance Site <br />(solution well field and upper plant) and the Pazachute Site (lower plant, which is not <br />covered by the Permit). It also contains a process monitoring section, (found in Section <br />4.0 of the Water Monitoring Plan, Appendix )) for mining operations at the Piceance Site. <br />As specified in Appendix I, the ground water and surface water monitoring programs in <br />this Permit includes two monitoring periods: the baseline period, and the first five (5) <br />years of commercial operations. Established trends will be developed prior to start-up of <br />commercial operations...... <br />~k %k ~k <br />IS MODIFIED TO READ: <br />PART I. AUTHORIZATION TO CONSTRUCT AND OPERATE <br />Pursuant to the Underground Injection Control Regulations of the U. S. Environmental <br />Protection Agency codified at Title 40 of the; Code of Federal Regulations, Parts 124, 144, 146, <br />and 147, <br />American Sada, L.L.P. <br />2717 County Road 215 <br />Minor Modification No. 8 UIC Permit No. 0030858-00000 Page 4 of 8 <br />