Laserfiche WebLink
-I4- <br />MLRD Findings Document: Stipulation No. 13, p. IS <br />OSM Findings Document: Stipulation No. 13, p. 6 <br />OSM TEA: Stipulation No. 15, p. 35 as follows: <br />15. Stipulation 6: Amine inflow map shall be submitted to the regulatory <br />agency annually. This map shall identify and describe alI water inflows <br />to the mine workings during that year's monitoring. The description <br />shall include sources of water, quantities of flow, Location of <br />occurrence, and duration of flow. Also, water imported into the mine <br />and mine discharges shall be rtanitored. <br />41. Stipulation: SHOULD THE APPLICANT ENCOUNTER MORE GROUND WATER THAN <br />ANTICIPATED, PRIOR TO THE DISCHARGE OF EXCESS MINE WATER, TXE APPLICANT <br />SHALL PROVIDE RN ANALYSIS O£ ANTICIPATED WATER QUALITY AND QUANTITY, RND <br />AN ASSESSMENT OF THE EFFECTS ON TXE RECEIVING STREAM. <br />MLRD Findings Document: Stipulation No. 23, p. 19 <br />OSM Findings lbcument: Stipulation No. 24, p. 8 as follows: <br />24. Should the applicant encounter more ground water than anticipated, <br />the applicant shall provide to the regulatory authority an analysis <br />of anticipated water quality and quantity, and an assessment of the <br />effects on the receiving stream prior to any discharge. <br />OSM TEA: This stipulation has not been included in the TER <br />42. Stipulation: ARCO COAL MUST REVISE ITS BACKFILL GRADING PLAN TO CONFORM <br />WITH TXE RECOMMENDATIONS PRESENTED WITHIN THE REPORT ENTITLED "REPORT ON <br />STABILITY ANALYSES AND RECOMMENDATIONS FOR RECLAIMED SURFACE FACILITY AT <br />THE ARCO MT. GUNNISON NO. 1 MINE", PREPARED BY MERRICK AND COMPANY FOR <br />ARCO COAL. THIS REPORT SHALL BE INCLUDED WITHIN THE PERMIT APPLICATION, <br />AND DESIGNATED RS EXHIBIT 3.2.2.C, AS INDICATED BY ARCO ON PAGE 3-24a OF <br />TXE REVISED PERMIT APPLICATION. <br />MLRD Findings Document: Stipulation No. 32, p. 43 <br />OSM Findings Document: Stipulation No. 33, p. 10 <br />OSM TEA: This stipulation has not been included in the TER <br />43. Stipulation: THE APPLICANT SHALL SUBMIT TO THE DIVISION COPIES OF TXE <br />REPORTS, EXHIBITS RND RLL SUBSEQUENT AMENDMENTS SUBMITTED TO THE GUNNISON <br />COUNTY PLANNING COMMISSION, TITLED PROTECTION OF MINNESOTA CREEK WATER <br />SUPPLY. THIS MATERIAL SXRLL BE SUBMITTED IN A FORM WHICH CAN BE INSERTED <br />INTO THE PERMIT APPLICATION AND REFERENCED IN THE TEXT SECTION 2.8.5.2, <br />AS REQUIRED UNDER RULE 2.04.7(3), ALTERNATIVE WATER SUPPLY INFORMATION. <br />MLRD Findings Document: Stipulation No. 10, p. 9 <br />OSM Findings Document: Stipulation No. 26, p. 8 <br />OSM TEA: Stipulation No. 22 (listed as No. 1, under Section 817.54), p. 71 <br />