Laserfiche WebLink
.: <br />b. <br />c. <br />d. <br />e. <br />f. <br />9- <br />h. <br />i. <br />]~ <br />an inventory of materials handled a the <br />facility and an assessment of their potential <br />to contribute pollutants to storm w ter; <br />a preventive maintenance program; <br />good housekeeping procedures; <br />spill prevention and response proce ures; <br />storm water management measures; <br />sediment and erosion prevention pla s; <br />employee training programs; <br />visual inspection plans; and <br />certification of the absence of non-Storm <br />water. <br />In most cases, the development and implem ntation <br />of a Pollution Prevention Plan will take the p ace of <br />C specific effluent limits. <br />2. Dischargers eligible <br />Under the current proposal, the following <br />dischargers would be eligible to be covered by the <br />general permit: dischargers in a) non-NPDES s ates <br />which are b) not subject to existing effluent <br />guidelines limiting storm water and c) do not ave <br />existing NPDES permits for their storm water <br />discharges. <br />Dischargers in NPDES states will only be eligible <br />if the state has a) general permit authority an <br />- 12 - <br />