My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30561
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:04 PM
Creation date
11/23/2007 6:45:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974015
IBM Index Class Name
General Documents
Doc Date
1/29/1970
Doc Name
SITE DEVELOPMENT PLAN FOR PROPOSED SAND & GRAVEL MINING OPERATION NEAR LYONS COLO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i- <br />'"'S <br />.~ PROPOSED CHANGES <br />9 <br />^"7 <br />_ j Comments. Western Paving Construction Company (W^C) propose:. to mine <br /> sand and grave], from approximately 100 of the 194 acres comprising the John <br /> Weng farm. WPC plans to crush, screen and otherwise process sand and gravel <br />'1 materials to meet Colorado Highway Department specifications. Some materials <br />-„ J <br /> may be stockpiled on the site. Most of the materials (probably abut 9D%) <br /> will be hauled fr <br />m th <br />t <br />b <br />il <br />d <br />d t <br />k <br /> o <br />e proper <br />y <br />y ra <br />roa <br />an <br />ruc <br />s. <br />.,.,r WPC's site development plan is shown on Exhibit 4. An architectural <br />-•~~ sketch, in color,;o~ WPC's proposed site reclamation plan is availaible for <br />'~ inspection at meetings and discussions. It expresses pictorially 4~PC's <br />_} <br /> present concept and intent as to the probable appearance of the site after <br /> completion of its mining operations in about the year 1985. <br /> South Branch Relocation. WPC plans to relocate the present meandering <br /> channel of the South Branch of St. Vrain Creek on the Weng farm, from the <br />"'1 <br />--~ present entry point on the wes t property line to the present exit p~~int on <br /> <br />~ the south property line. The relocated channel will extend from the entry <br />_ <br />point south on a straight line <br />about 1,300 feet to a <br />point near t <br />he south- <br />west corner of the Weng farm, then east on a straight line about 8b` feet <br />to the exit point, as shown on the site development plan, Exhibit 4. Typical <br />sections of the relocated South Branch are shown on Exhibit 4. <br />-~ Structure details for relocated South Branch facilities are shown on <br />~ <br /> Exhibit 5. Hydraulic computations are shown on Exhibit 6 for (1) South <br /> Branch channel relocation, (2) Goss No. 2 and Clough and True ditche>, (3) <br /> Clough and True Ditch, and (4) wasteway channel to St. Vrain Creek. <br /> <br /> <br />:~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.