SECTION II -REVISIONS TO THE PERMIT <br />The following is a summary of revisions to the permit since the previous Midterm Review dated August 7, 1998. Since <br />the last Midterm Review there has been an increase in bond amount required from $4,718,338.OQ to the cturent liability <br />amount of $8,950,763.00. As stated in Section V[, the current bond amount held is $9,000,000.00. <br />TECHNICAL REVISIONS <br />Nu- <br />30 Revised and New Drainage Channel Approve 9/3/98 No <br /> Designs and Profiles <br />31 Design Information for Haul Road Approve 8/14/98 +$74,978.00 <br /> H & Removal of Diversion Ditches <br /> No. 5&No. 8 <br />32 Midterm Review Responses Approve 2/25/99 No <br />33 Development Activities for II- W Approve 7/8/99 +$5,000.00 <br /> South Extension <br />34 Auger Mining Approve 5/17/00 No <br />35 Increase South Dismrbance Area Approve 6/29/00 +$67,103.00 <br />36 Haul Road H Certification Approve 7/6/00 No <br />37 Haul Road L Design Approve 7/2/01 No <br />38 As Built Cert. For Pond 16 Approve 7/30/01 No <br />39 As Built Cert. For H.R. I Approve 7/30/01 No <br />40 10.5 ac. Disturbance Increase Approve 10/2/01 +$118,496.00 <br /> for buffer <br />4l Pond 17 Revised Design Approve 10/4/02 No <br />42 Interim and Permanent Access Approve w/cond. 10/14/03 No <br /> Road Design Modifications <br />43 H.R. J As Built Certification Approve 3/18/03 No <br />44 Ownership & Control Updates Withdrawn 7/3/03 No <br />REVISIONS <br />Na <br />48 Relocate Substation, Extend Approve 10/4/00 +$21,532.00 <br /> Powerline <br />49 Drill Additional Monitoring Wells Approve 5/17/01 +$6,166.00 <br />50 Install Additional Culvert Approve 1/31/02 +$10,906.00 <br />51 Revise Seedmix #4 Approve w/Condition No <br /> Stipulation No. 29 <br /> 3/21/02 <br />52 Allow Use of Rotoclear Machine Approve 3/13/03 No <br />53 Construct 4 Topsoil Stockpiles Approve 5/15/03 No <br />54 Permit Area Drilling Approve 9/8/03 +$63,937.00 <br />5 <br />