My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30475
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:00 PM
Creation date
11/23/2007 6:44:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/4/2007
Doc Name
Proposed Decision & Findings of Compliance for PR2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS, COLOWYO SHALL ESTABLISH ONE OR MORE POINTS OF COMPLIANCE <br />FOR THE COLOWYO MINE. <br />STIPULATION 8 <br />NO LATER THAN 15 MARCH 2008 THE COLOWYO COAL COMPANY SHALL SUBMIT A <br />TECHNICAL REVISION TO THE DIVISION CONTAINING A COMPREHENSIVE <br />RECLAMATION PLAN FOR THE EAST PIT, WEST PIT, SECTION 16 PIT, SOUTH TAYLOR <br />PIT, FACILITIES AREA, GOSSARD LOADOUT AND ALL REMAINING DISTURBANCES AT <br />THE COLOWYO MINE. THE REVISION WILL ELIMINATE OUTDATED METHODS OF <br />RECLAMATION THAT ARE CURRENTLY USED AT THE COLOWYO MINE. FURTHER, <br />THE REVISION WILL ADDRESS DIVISION CONCERNS REGARDING REVEGETATION, <br />SOILS HANDLING AND SPECIES DIVERSITY SUCCESS STANDARDS, ETC. TO MEET THE <br />CURRENT POST-MINING LAND-USE. CONSULTATION WITH THE DIVISION, THE <br />COLORADO DIVISION OF WILDLIFE, THE BUREAU OF LAND MANAGEMENT AND <br />OTHER APPROPRIATE AGENCIES WILL BE NECESSARY. <br />STIPULATION 9 <br />PRIOR TO CONDUCTING ANY HIGHWALL MINING IN THE SOUTH TAYLOR PIT THE <br />COLOWYO COAL COMPANY SHALL SUBMIT A TECHNICAL REVISION TO THE <br />DIVISION INCLUDING A MINING PLAN AND SEQUENCE, A STABILITY ANALYSIS AND <br />A ZERO SUBSIDENCE ANALYSIS AND PLAN. HIGHWALL MINING MAYNOT BEGIN IN <br />THE SOUTH TAYLOR PIT UNTIL THE AFOREMENTIONED REVISION HAS BEEN <br />APPROVED BY THE DIVISION. <br />STIPULATION 10 <br />PRIOR TO DISTURBING ANY LANDS ALONG THE WILSON CREEK THE COLOWYO <br />COAL COMPANY SHALL PROVIDE THE DIVISION WITH A DETAILED ANALYSIS AND <br />DISCUSSION OF THE ALLUVIAL VALLEY FLOOR (AVF) THAT HAS BEEN <br />DOCUMENTED IN THE AREA. COLOWYO MUST ALSO PROVIDE A DETAILED PLAN <br />FOR THE RESTORATION OF THE AVF IF AND WHEN IT IS DISTURBED. THIS ANALYSIS <br />MAY BE IN THE FORM OF A STAND-ALONE REVISION OR IT MAY BE CONTAINED IN <br />THE REVISION REQUIRED IN STIPULATION 3. ANY REVISION SUBMITTED MUST BE <br />APPROVED BY THE DIVISION PRIOR TO ANY DISTURBANCE. <br />This Decision is based on a finding that the operations will comply with all requirements of the <br />Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et seq., and the Rules <br />promulgated pursuant to the Act. Public notice of this proposed Decision will be published for two <br />Proposed Decision and Findings of Compliance 4 May 2007 <br />Permit Revision 02 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.