Laserfiche WebLink
BASICALLY DESCRIBED AS FOLLOWS: <br />SW'/a SW'/a SECTION IS <br />SW'/a SW'/a SECTION 22 <br />SE'/a NE'/a SECTION 28 <br />SWYa SE'/a SECTION 28 <br />E''h NW'/a SECTION 33 <br />W'/z SW'/4 SECTION 33 <br />THE ADDITIONAL STUDY DATA WILL BE FORWARDED TO THE COLORADO HISTORIC <br />SOCIETY FOR THEIR EVALUATION AND A DETERMINATION OF THE PROPER COURSE <br />OF ACTION REQUIRED. <br />STIPULATION 5 <br />WITHIN 30 DAYS AFTER THE APPROVAL OF PERMIT REVISION 02 THE COLOWYO <br />COAL COMPANY WILL SUBMIT A MINOR REVISION TO THE PERMIT TO INCLUDE TWO <br />ADDITIONAL GROUND WATER MONITORING SITES. THE SITES TO BE INCLUDED ARE <br />A7 AND A8, BOTH ALONG THE WEST FORK OF GOODSPRING CREEK. <br />STIPULATION 6 <br />WITHIN 30 DAYS AFTER THE APPROVAL OF PERMIT REVISION 02 THE COLOWYO <br />COAL COMPANY WILL SUBMIT A MINOR REVISION TO THE PERMIT TO INCLUDE ONE <br />ADDITIONAL SURFACE WATER MONITORING SITE. THE SITE TO BE INCLUDED IS THE <br />UPPER WEST FORK OF GOODSPRING CREEK. <br />STIPULATION 7 <br />THE COLOWYO COAL COMPANY SHALL SUBMIT A TECHNICAL REVISION TO THE <br />DIVISION WHICH PROVIDES AN ANALYSIS OF GROUNDWATER POINTS OF <br />COMPLIANCE AT THE COLOWYO MINE PURSUANT TO RULE 4.05.13(1). THIS <br />ANALYSIS WILL BE DONE IN CONSULTATION WITH THE DIVISION AND WILL <br />INCLUDE A WRITTEN DETERMINATION OF THE NEED FOR GROUNDWATER POINTS <br />OF COMPLIANCE AT THE MINE. IF DEEMED APPROPRIATE, BASED ON THIS <br />Proposed Decision and Findings of Compliance 4 May 2007 <br />Permit Revision 02 Page 7 <br />