TR-61: Technical Revision 61 was received on 17 November 2005, called complete on 23 November <br />2005 and approved on 22 March 2006. TR-61 revised and updated the reclamation cost estimate and <br />bond. <br />TR-62; Technical Revision 62 was received on 4 November 2005, called complete on 9 November <br />2005 and approved on 29 May 2006. TR-62 changed the topsoil replacement depth. <br />TR-63; Technical Revision 63 was received on 8 November 2005, called complete on 21 November <br />2005 and has not yet been approved. TR-63 addresses the post-mining topography for the East and <br />West Piis. <br />TR-64: Technical Revision 64 was received on 29 March 2006, called incomplete on 6 Apri12006, <br />called complete on 8 May 2006 and approved on 17 October 2006. TR-64 revised the Streeter Draw <br />Fill and Section 16 Fill monitoring requirements. <br />TR-65: Technical Revision 65 was received on 19 April 2006, called incomplete on 26 April 2006, <br />called complete on 10 May 2006 and has not yet been approved. TR-65 proposes to revise to the <br />Section 16 Pit advance limits and highwall mining. <br />TR-66: Technical Revision 66 was received on 14 August 2006, called incomplete on 24 August <br />2006, called complete on 6 September 2006 and approved on 31 January 2007. TR-66 revised and <br />updated the reclamation cost estimate and bond. <br />3.1.6 Status of Minor Revisions <br />This section identifies Minor Revisions (MR) processed since the findings of Renewal Ntunber 4, 22 <br />October 2002. <br />MR-60: Minor Revision 60 was received on 2 June 2003, called complete on 9,June 2003 and <br />approved on 9 June 2003. MR-60 modified to the topsoil stripping schedule. <br />MR-61: Minor Revision 61 was received on 26 November 2003, called complete on 26 November <br />2003 and approved on 1 January 2004. MR-61 revised the blasting record document and monitoring <br />procedures. <br />MR-62: Minor Revision 62 was received on 12 Apri12004, called complete on 13 April 2004 and <br />approved on 13 Apri12004. MR-62 revised the permit to expand two topsoil stockpiles and add a <br />power line. <br />MR-63: Minor Revision 63 was received on 14 June 2004, called complete on 21 June 2004 and <br />approved on 21 June 2004. MR-63 revised to the blast record form. <br />Proposed Decision and Findings of Compliance 4 May 2007 <br />Permit Revision 02 Page 12 <br />