Laserfiche WebLink
{ fi ~ r <br />Stipulations <br />STIPULATION N0. 1 <br />THE PERMIT APPLICATION DOCUMENT MUST BE UPDATED TO REFLECT ALL CHANGES AND <br />AGREEMENTS REACHED DURING THE REVIEW PROCESS WITHIN FIVE (5) DAYS OF THIS <br />DECISION BECOMING FINAL. <br />STIPULATION N0. 2 <br />LA PLATA COAL CORPORATION WILL COMPLETE A WELL WITHIN THE HAY GULCH ALLUVIUM <br />WITHIN TEN (10) FEET, MEASURED HORIZONTALLY, DOWNGRADIENT FROM THE OUTSLOPE OF <br />THE SEDIMENT POND WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE. THIS WELL WILL <br />BE OF ADEQUATE DIAMETER AND DEPTH TO PROVIDE WATER QUALITY AND DEPTH-TO-WATER <br />INFORMATION. DEPTH-TO-WATER INFORMATION WILL BE OBTAINED, AT A MINIMUM, ON A <br />QUARTERLY BASIS. WATER WILL BE SAMPLED SEMI-ANNUALLY AND ANALYZED FOR THE <br />PARAMETERS LISTED IN TABLE I. REPORTS WILL BE SUBMITTED TO THE DIVISION ON AN <br />ANNUAL BASIS. <br />STIPULATION N0. 3 <br />LA PLATA COAL CORPORATION WILL COMPLETE A WELL (SEPARATE OF THE WELL ADDRESSED <br />IN STIPULA7ION NO, 2) WITHIN THE HAY GULCH ALLUVIUM WITHIN TEN (10) FEET, <br />MEASURED HORIZONTALLY, DOWNGRADIENT FROM THE EDGE OF THE PROPOSED LEACH FIELD <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE. THIS WELL WILL BE OF ADEQUATE <br />DIAMETER AND DEPTH TO PROVIDE DEPTH-TO-WATER INFORMATION. DEPTH-TO-WATER <br />INFORMATION WILL BE OBTAINED, AT A MINIMUM, ON A SEMI-ANNUAL BASIS. <br />MONITORING WILL BE CONDUCTED DURING SPRINGTIME SNOWMELT RUNOFF AND THE WET <br />PERIOD OF SEPTEMBER OR OCTOBER. MONITORING REPORTS WILL BE SUBMITTED TO THE <br />DIVISION WITHIN THIRTY (30) DAYS OF THE DATE OF MONITORING. <br />STIPULATION NO. 4 <br />LA PLATA COAL CORPORATION WILL SUBMIT A PLAN TO THE DIVISION ADDRESSING <br />TREATMENT OF ACIDIC DRAINAGE AT THE MINE SITE WITHIN FIVE (5) DAYS OF PERMIT <br />ISSUANCE. THE PLAN IS TO BE IMPLEMENTED WITHIN THIRTY (30) DAYS OF DIVISION <br />APPROVAL. PRIOR TO RECEIVING DIVISION APPROVAL OF THE TREATMENT PLAN, LA <br />PLATA COAL CORPORATION WILL TAKE ALL APPROPRIATE MEASURES TO ENSURE THAT THE <br />pH OF OFFSITE DISCHARGES ARE BETWEEN pH 6 AND 9. <br />STIPULATION NO. 5 <br />WITHIN FIVE (5) DAYS OF THIS DECISION BECOMING FINAL, LA PLATA COAL <br />CORPORATION MUST SUBMIT REVISED COPIES OF MAP N0. 12, "POST-MINING <br />TOPOGRAPHY", TO THE DIVISION. THE MAP MUST CLEARLY DEPICT ANTICIPATED <br />PRE-MINING CONTOURS AND BE SUPPORTED BY REPRESENTATIVE CROSS-SECTIONS WHICH <br />CLEARLY SHOW THAT ALL DISTURBED AREAS WILL BE RETURNED TO ANTICIPATED <br />PRE-MINING (APPROXIMATE ORIGINAL} CONTOURS. <br />-3- <br />