Laserfiche WebLink
:S <br /> <br />blue <br />ribbon <br />coal <br />company <br />Pc. <br />III IIIIIIIIIIIIIIII <br />999 <br />blue ribbon coal company <br />p.o. box 1352 <br />palisade, Colorado 81526 <br />(303) 464-7951 <br /> <br />SEP 18 ?986 <br />September 15, 1986 <br /> <br />Mr. Tom Schreiner <br />Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203-2273 <br />Subject: Blue Ribbon Reclamation, Soil Samples - File C-047-81 <br />Dear Tom: <br />As you requested during your mine site inspection September 10, 1986, enclosed <br />is a copy of soil analysis done on portions of the reclaimed slope at Blue <br />Ribbon. The fertilizer application rate suggested by Soltesco will be used <br />for the revegetation work this fall. <br />If there are any questions about these samples, let me know. <br />Sincerely, <br />Larry M. eschke, E. <br />Project Engineer <br />LRM:tgn <br />xc: Jim Stover <br />