Laserfiche WebLink
compliance with 2.05.4(2), add such a map to the permit application using a scale of 1 <br />inch = 100 ft. and a contour interval of 2 fr. <br />2. Page 5-31 of the reclamation plan says excess topsoil from stockpiles #4 and #7 will be <br />distributed on azeas adjacent to reclaimed areas. Task 38 ofthe current reclamation cost <br />estimate in the permit indicates the plan was to distribute this excess topsoil on the gravel <br />pit area. To ensure compliance with Section 2.03.3(1), please add to the table on page 5- <br />30 ofthe reclamation plan the specific destinations for all topsoil that is in stockpiles #4 <br />and #7. Please use the existing volumes, plus an appropriate amount of swell. Adding <br />this information to the table will enable the Division to update the cost estimate for Task <br />38 in the draft estimate for TR-13 that currently is in review. <br />3. To ensure compliance with Section 2.03.3(1), please update the reclamation timetable <br />and schedule on page 5-33 of the reclamation plan; it currently says reclamation is <br />anticipated for 2005. <br />Carbon Junction Mine Page 5 January 26, 2006 <br />Midterm Review <br />