Laserfiche WebLink
- 3 - <br />• 2. The following are stipulated for surface water monitoring: <br />~~ <br />a) Flow measurements must be taken at surface water monitoring <br />site Sld-2 and water quality samples must be taken from sites <br />SW-2 and SW-5 on :fcClane Canyon twice a year as follows: <br />i) Once during spring snowmelt <br />ii) Once during a storm event <br />b) Flow measurements must be taken quarterly at Site SW-1 and <br />water quality samples must be taken quarterly from sites SW-1 <br />and the new monitoring site on East Salt Creek (which must be <br />located on a map with a specific designation and must be ap- <br />proved by CMLRD and OSM. <br />c) The water samples must be chemically analyzed for the parame- <br />ters specified below: <br />• Sodium Absorption <br />pH Ratio Icad (Pb) <br />Specific Conductance - Bicarbonate~HC03) Sodium(NA+) Manganese (t7n) <br />Temperature (field) Calcium(Ca+ ) Sulfate(S04) Mercury(Hg) <br />Dissolved Oxygen (field) Aluminum(A1) Molybdenum(ito) <br />• - Arsenic(As) Selenium(Se) <br />Total Suspended Solids Magnesium(Lfg+2) Boron(B) Zinc(Zn) <br />Total Dissolved Solids Cadmium(Cd) <br />Total Combustible Solids Copper(Cu) <br />" _ Total Hardness Iron(Fe) ' <br />_ d) The results of all monitoring must be submitted to the OSt1 and <br />'~'~ CMLRD immediately after data collection. <br />3. The permittee must submit to the OSt4 and CMLRD an annual report charac- <br />' terizing the inflows, discharges and the consumption of water within [he <br />mine. This report is to include a mine workings map showing the loca- <br />tions and quantity of Snflows; a table keyed to the mine map which shall <br />contain the source (i.e. fault, fractures, etc.), quantity, duration,and <br />quality (i.e. pH, electro-conductivity and temperature) of all non-seep <br />inflows; a table containing records of water discharged from the mine, <br />consumed in the mine and imported for use within the mine; a discussion <br />of the water balance within the mine; and, a projection of hydrologic im- <br />pacts of mining in the upcoming year. <br />4. The permittee will continue monitoring wells GlJ-1 and G~J-4 in East Salt <br />Creek alluvium quarterly. At these times the water level in the welts <br />will 6e measured and samples wil'_ be taken for analysis of pH, tempera- <br />ture and specific conductance. The results of this monitoring will be <br />submitted to the OS.'1 and C:iLRD immediately after data collection and an- <br />alysis. <br />• 5. Within 5 ^onths of permit issuance, the applicant must provide to the <br />` ~ Regulatory Authority an analysis of [he fill and any other disturbed <br />