Laserfiche WebLink
- ' ~"" Coal Ridge No. 1 Mine - 3 - ADr11 6, 1990 <br />-'==r =s = Stipulation No: 13 <br />_--- -~= THE RECLAMATION PLAN FOR THE MINE SHALL BE REYISED TO INCLUDE DOWNSIZING OF <br />-~-~~ THE CURRENT ACCESS AND TEMPORARY HAUL ROAD FROM ITS PRESENT 40 FOOT WIDTH TO A <br />_~ ~- MAXIMUM WIDTH OF 20 FEET: RECLAMATION OF THE REMAINDER OF THIS ROAD SHALL BE <br />__. CONDUCTED ACCORDING TO THE APPLICABLE REQUIREMENTS OF RULE 4.03.1(7): <br />---~ , ~ The required revision has not been submitted to the applicant, therefore this <br />-' •- Stipulation is still in effect: <br />Stipulation No: 14 <br />THE APPLICANT WILL RECLAIM ALL LIGHT-USE EXPLORATION ROADS EXCEPT THOSE <br />SPECIFICALLY REQUESTED TO BE RETAINED BY THE LAND OWNERS. THE RETAINED ROADS, <br />HOWEVER, WILL HAVE THE SURFACE, CUTS. AND FILL RE-SEEDED BY THE APPROVED SEED <br />~= MIXTURES TO CONTROL EROSION. <br />'-~-'_ ~ Since final reclamation activities have not'yet commenced at the site, this <br />Stipulation is still in effect. ' <br />- _ == {= Stipulation No: 15 <br />THE RECLAMATION PLAN FOR THE MINE SHALL BE REVISED TO INCLUDE REGRADING OF THE <br />PORTAL AREAS, INCLUDING RELATED WORKING PADS AND ACCESS ROADS, TO A CONDITION <br />THAT APPROXIMATES THE ORIGINAL SITE TOPOGRAPHY AS INDICATED BY THE BACKGROUND <br />CONTOURS ON THE N.C.E.C. PRELIMINARY GRADING PLAN MAP, SCHMUESER & ASSOCIATES, <br />REVISED 4/10/88. TOPSOIL DISTRIBUTION AND REYEGETATION OF THE REGRADED PORTAL <br />AREAS WILL BE CONSISTENT WITH THAT APPROYED FOR THE REMAINDER OF THE MINE SITE. <br />This revision to the reclamation plan has also not been submitted by the <br />permittee, therefore the Stipulation is still in effect. <br />Section III - Bonding <br />The Division holds an approved reclamation bond in the form of Certificates of <br />Deposit in the amount of E288,000.00. Calculations indicate that the <br />permittee has a reclamation liability of E188,000.00 for the current <br />disturbance. Under the reclamation-only status of the permit, therefore, the <br />bond amount is deemed sufficient to assure completion of the reclamation plan. <br />BC/es <br />cc: Mike Savage <br />Mr. E. Peter Mattheis, NCEC <br />5709E <br />