Laserfiche WebLink
<br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />Y313 Sherman 51.. Room 275 <br />Denver, CO 80203 <br />303 866-3567 <br />Fax: 303 632-8706 <br />~pf ~O(0 <br />e <br />„~(Q7 ~~ <br />~~ ~~• <br />~ 1876 ~ <br />Roy Romer, <br />Goverrpr <br />Fred R. Banta, <br />DATE• April 6, 1990 Division Duector <br />T0: Coal Ridge No. 1 Mine (C-84-065) File <br />FROM: Bill Crick''~~ <br />RE: Mid-Term Review <br />This memo presents the results of the Division's mid-term review of New Castle <br />Energy, Inc.'s Coal Ridge No. 1 Mine. This review was conducted to fulfill <br />the requirements of Rues 2.08.3, 2.06.2(10). 2.06.3(4), 2.06,5(3), 2.06.7(5), <br />and 3,02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued <br />prior to its mid-term, in this case 1-1/2 years. Based on this review, for <br />good cause shown, the Division mdy require reasonable revision or modification <br />of the permit to ensure compliance with the Act and Regulations. <br />Rule 2.06.2, 2,06,3, 2.06,5, 2.06.7 require that experimental practices, <br />mountaintop removal variances, variances from AOC, and variances from <br />contemporaneous reclamation be reviewed by the Division during the mid-term <br />review. These Rules are not applicable to the Coal Ridge No. 1 operation. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond and <br />the terms of acceptance of the bond. <br />The original mining and reclamation permit for the Coal Ridge No. 1 Mine was <br />issued to Storm King Mines, Inc. on November 11, 1985, with a permit term of <br />three years. The name of the company was subsequently changed to New Castle <br />Energy Corporation, An application for permit renewal was received by the <br />Division on April 12, 1987. Numerous adequacy issues from the previous <br />mid-term review were outstanding at the time, Following more than a year of <br />attempts to gain financing, New Castle Energy formally requested a permit <br />renewal allowing only reclamation activities on January 17, 1989. <br />The permit for the Coal Ridge No. 1 Mine was renewed on December 10, 1989, <br />allowing only reclamation activities, and for a permit term of 3 years, At <br />that time adequacy issues pertinent to the reclamation plan were resolved, <br />several of which required Stipulations to the permit. Since the renewal took <br />place no revisions have been approved by the Division, therefore the status of <br />the permit has not changed. For this reason the Division is requiring no <br />revision of the permit at this time. <br />