Laserfiche WebLink
Section III -Status of Stipulations <br />At the time of the permit renewal, three stipulations were in effect. To date, Sun Coal Company and the <br />Division have resolved all of those stipulations, and the Division has since imposed no additional <br />stipulations. Listed below are all of the stipulations in effect at the time of the permit renewal and the <br />status of those stipulations. <br />Stipulation No. 6 <br />THE PERMrITEE SHALL REGULARLY MONrTOR TILE SURFACE STADILnY OF THE BACKF7LLED AREA OF THE MEADOWS NO. <br />1 MINE, REPRESENTED IN TECHNICAL REVISION NO.2. THE PERMrI"IEE SHALL COMINUE TO SUBMIT THESE MONrTORING <br />REPORTS AND A SUMMARY OF SUCH OBSERVATIONS ANNUALLY TO THE DIVISION. SHOULD STABILITY PRODLEMS ARISE, <br />THE PERMITTEE WILL RECII FY SUCH PROBLEMS AS UIRL-CTED DY THE DIVISION. <br />Origination: Technical Revision No. 2 <br />Status: Terminated with approval of Technical Revision No. 17. <br />Stipulation No. 12 <br />WrrHIN THIRTY (3O) DAYS OF PERMIT ISSUANCE, THE PERMI"T"IFF SHALL SUBMIT PROOF TO THE DIVISION THAT KENTUCKY <br />NOTICE OF VIOLATION NO 910243049 HAS DEEN OR IS DEING CORRECTED, OR THAT THE VIOLATION IS UNDER <br />ADMIMSTRATIVE OR JUDICIAL REVIEW, IF AT THAT TIME THE VIOLATION IS UNDER REVIEW, SUN COAL COMPANY MUST <br />SUBMIT THE RESULTS OF THE APPEAL TO THE DIVISION AT THE TIME OF RESOLUTION. <br />Origination: Permit Renewal No. 2 <br />Status: Terminated with approval of Minor Revision No. 7. <br />Stipulation No. 13 <br />WrTHIN Th11RTY (3O) DAYS OF TIIE DIVISIONS PROPOSAL TO APPROVE THE MEADOWS NO. 1 MINE PERMIT, SUN COAL <br />COMPANY MUST SUBMIT A TECHNICAL REVISION APPLICATION WHICH ADEQUATELY ADDRESSES AND RESOLVES THE <br />CONCERNS RAISED IN THE DIVISIONS PRELIMINARY ADEQUACY REVIEW LETTER DATED APRIL 27, 1993. <br />Origination: Permit Renewal No. 2 <br />Status: Tenminated with approval of Technical Revision No. 15. <br />Meadows No. 1 Mine (C~1-029) February 6, 1996 <br />Midlertn Review ~] Third Permit Term <br />