Laserfiche WebLink
DECEIVED <br />NOU 12 1£~3 <br />;;r Minerals 8 Geology <br />BEFORE THE MINED LAND RECLAMATION BOARD <br />STATE OF COLORADO <br />File No. M-78-107 <br />PROPOSED PRE-HEARING CONFERENCE ORDER <br />~~~ ~~~,_iC 1=1LE COPY <br />FILE: M-~B-~a~ <br />SITE: 'foze~ Prt <br />IN THE MATTER OF THE TOZER - TOZER PIT -AMENDMENT APPLICATION <br />The Pre-Hearing Conference in this matter was held on November 9, 1998 in <br />Durango, Colorado, before Board Member William T. Cohan, acting Pre-Hearing Conference <br />Officer. This Pre-Hearing Conference Order ("Order") will control the hearing procedure in <br />this matter. <br />This Order is proposed to the Mined Land Reclamation Board ("Board") for its <br />approval and, with any amendment made by the Board, shall be effective upon the Board's <br />approval. <br />The formal public hearing shall be conducted according to the Rules and Regulations <br />in effect at the time of the hearing. Any objections to the provisions of this proposed <br />Order shall be filed with the Division of Minerals and Geology ("the Division"-, Durango <br />Field Office, 484 Turner Drive, Building F, Suite 101, Durango, CO 81301 (Telephone: <br />(970) 247-5469; FAX: (970) 247-5104) and served upon the parties by 5:00 p.m., <br />November 13, 1998. The Board will consider such objections as preliminary matters at the <br />formal public hearing. <br />FORMAL PUBLIC HEARING <br />The formal public hearing before the Board shall be held on November 18-19, 1998, <br />during the Board's regular meeting, at 1313 Sherman Street, Room 318, Denver, Colorado <br />(Telephone: (303) 866-3567), and shall begin at 9:00 a.m., or as soon thereafter as the <br />matter can be heard. <br />• iii iiiiiiiiiiiii-ii <br />