My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-01_REVISION - M1985184
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985184
>
2003-12-01_REVISION - M1985184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:44 PM
Creation date
11/22/2007 1:38:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985184
IBM Index Class Name
Revision
Doc Date
12/1/2003
Doc Name
Cost Summary Form
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 12/01/2003 <br />User : ESC <br />State :Colorado PermiUjob# :M-1985-184 <br />County : Larimer Abbreviation :none <br />Site :Killion Supply Filename :M184-003 <br />Agency or organization name :Division Of Minerals & C <br />Permit or otherjob action :TR-Of <br />Task description :Replace Fill Dirt & <br />HOURLY EQUIPMENT COST <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $50.90 NA <br />Operating cosVhour : $69.48 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosVhour : $31.83 NA <br />Total unit cost/hour : $152.21 Total fleet cosUhour : $152.21 <br />: <br />MATERIAL QUANTITIES , <br />Initial Swell Loose <br />volume: 9,000 LCY factor : NA volume: 9,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Loam <br />Pit Shorelines <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank riooer <br />0.00 % (I <br />5,500 feet <br />2.100 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 1.10 <br />Blade type : 1.00 <br />Net correction : 0.37 <br />Adjusted unit production : 181.03 LCY/hr <br />Adjusted fleet production : 181.03 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 49.71 Hours <br />Unit cost : $0.841 /LCY Total job cost : $7,567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.