Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 12/01/2003 <br />User: ESC <br />State :Colorado Permit/job# : M-1985-184 <br />County :Larimer Abbreviation :none <br />Site :Killion Supply Filename :M184-002 <br />Agency or organization name :Division Of Minerals & <br />Permit or other job action : TR-Ol <br />Task description :PUSh PfOC@SSed <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />South Shoreline <br />Horsepower: 310 <br /> <br />Shift basis : 1 per day <br /> <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.90 NA <br />OperatingcosUhour : $69.48 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $31.83 NA <br />Total unit cosUhour : $152.21 Total fleet cosUhour : $152.21 <br />: ,: ;: ::: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,000 LCY factor : NA volume: 4,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Source <br /> Operator skill : 0.75 (av; <br />Average push distance : 200 feet Material consistency : 0.80 (Cat <br />Unadjusted howdy production : 491.9 LCY/hr Dozing method : 1.00 (ge <br /> Visibility : 1.00 (av; <br />Material consistency description : Job efficiency : 0.83 (1shiH <br />Rock, well ripped or blasted Spoil pile : 0.80 (fnd <br /> Push gradient : 1.00 (Cat <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat <br />Average site altitude : 5,500 feet Material weight : 0.85 (Cat <br /> Blade type : 1.00 (S/Sl <br />Material weight : 2, 700 Ibs/LCY Net correction : 0.34 <br />Weight description <br />Stone -crushed Adjusted unit production : 166.88 LCY/hr <br /> Adjusted Fleet production : 188.88 LCY/hr <br />JOB TIME AND COST ~~~ ~~~ ~~ ~~ ~~ ~~ ~ ~~~ <br />Fleet size : 1 Dozers) Total job time : 23.97 Hours <br />Unit cost : $0.912 /LCY Total job cost : $3,648 <br />HB) <br />