Laserfiche WebLink
<br />Mr. Thomas A. Schreiner <br />December 20, 1996 <br />Page 2 <br /> <br />4. We wish it be made clear that the proposed haul road, as <br />finally designed and approved, will be wholly constructed prior <br />to and as a precondition to commencement of operations i~r the <br />expanded area. <br />5. The reclamation plan, and financial arrangements therefore, <br />may not be adequate. <br />6. We remain concerned over the adequacy of the blasting plan <br />due to damage that has already occurred to our homes. <br />7. We have serious concerns that the application lacks an <br />adequate plan for the control of fugitive dust escaping t:he area <br />to be mined, and by reason of the transported materials i`rom the <br />site by either the new haul road or Tunnel Drive. <br />8. Expanded quarry operations will presumably result irc an <br />increased number of trucks entering and exiting, and travelling <br />upon, the affected land. <br />9. The public notice and public filings requirements irc <br />connection with the permit amendment application may not have <br />been properly and completely followed. In particular, with the <br />additions and revisions to the application being made as part of <br />the review process we are concerned that the public has Yiad <br />inadequate continuing notice of the application. <br />10. While we understand that your agency may take the position <br />that the hours and days of operation are beyond the juri::diction <br />of your agency, we remain very concerned with this issue, and <br />object to operation of the quarry during unreasonable hoL.rs and <br />for seven days a week. <br />In reiteration and/or in addition specific observations noted in <br />Rita Everett's letter dated November 18, 1996 and the Smiths' <br />letter dated November 22, 1996, the following specific <br />observations are made: <br />1. It is our belief and understanding that the stone water <br />detention ponds that are already supposed to exist on the <br />property as part of the presently permitted quarry operation have <br />never been finally constructed or maintained in compliance with <br />the SWMP we understand to presently be in effect. <br />