Laserfiche WebLink
<br />2. Will the construction involve the creation of any embankments? If so, <br />~/' provide information sufficient to ensure compliance with Rule <br />4.03.2(3)fd). <br />3. Will the construction involve culvert installation? If so, show the <br />location(s) on the drainage control maps and provide drainage control <br />details to ensure compliance with Rule 4.03.2(4), If drainage wi]1 be <br />directed to the pit or to existing downstream structures, then this <br />should be stated. <br />4. Please indicate your plans to ensure compliance with Rules 4.03.2(5) <br />and (6). <br />5. Please specify the general corridor dimensions. <br />6. Specify the topsoil salvage depth, and the anticipated volume of topsoil <br />to be stored in each windrow pile. <br />7. How will the topsoil be salvaged such that the resource is not damaged, <br />given the fact that operations will be conducted throuoh winter <br />Conditions. <br />S. Please specifically verify that the operation will in no way affect land <br />beyond the edge of the southeast rock rim. <br />BLM Stipulations <br />1. We will require BLM and USFW Service concurrence before we approve this <br />revision request. DOW has notified us of their approval. <br />Please call with any questions. <br />Sincere <br />lamation <br />DAB/scg~ <br />cc: Jim Stevens <br />2759E <br />