Laserfiche WebLink
The pond 005 embankment was pushed back <br />compacted. The topsoil salvaged during pon <br />recontoured pond area to a depth of approxin <br />complex was backfilled and graded. Topsoil <br />pond 002 azea. <br />The coal processing waste pile was covered <br />cover followed by one foot of topsoil. A tol <br />employee parking lot to provide sufficient n <br />depth. <br />Areas that had been regraded to the approves <br />mulched in the fall of 1996. These areas incl <br />longwall substation, service drop, ponds 002 <br />footprints, and the employee pazking area. T <br />waste disposal azea were seeded in May of 1' <br />The sediment control structtures and surface <br />water to the sediment ponds 003 and 004, wi <br />period. After the azea has been revegetated <br />met, Division approval will be requested for <br />Mine facilities that will be used for producti <br />shafts, methane degas wells, and access roar <br />Industrial Use post-mining land use classific <br />and reclaimed in accordance with the rules c <br />These facilities aze discussed in more detail <br />(b) Reclamation Cost Estimate <br />A detailed cost estimate of the reclamation <br />Supporting calculations for the bond and re <br />Exhibit 19, Bond Calculation:. ;: <br />mto the excavated pond area and <br />construction was spread over the <br />ately one (1) foot. Similarly, the pond 002 <br />~~as not available for reclamation of the <br />three feet of nontoxic non-combustible <br />borrow azea was permitted west of the <br />ial to achieve the required material <br />elevation contours were seeded and <br />ided the water tank pad and access road, <br />tnd 005, the supply yard, topsoil stockpile <br />ie topsoil borrow area and coal processing <br />tinage ditches, which are required to route <br />be left in tact during the revegetation <br />i the criteria of rule 4.05.2(2) have been <br />moval of these structures. <br />i of methane gas, including ventilation <br />to these facilities were approved for an <br />ion. These facilities will be bonded with <br />the Oil and Gas Conservation Commission. <br />Exhibit 31. ' <br />is included in this permit application. <br />anon cost estimate can be found in <br />(Revised 09/25/98 - TR-50) <br />