Laserfiche WebLink
SECTION 02776.0 GEOMEMBRANE <br />PART 1: GENERAL <br />1.01 SUMMARY: <br />This SPECIFICATION describes requirements for the manufacture, fabrication (if needed), <br />supply, and installation of polyethylene geomembrane for lining of the heap leach pad, as <br />shown on the DRAWINGS; and construction quality control monitoring and testing. All <br />procedures, operations and me[hods shall be in strict compliance with the SPECIFICATIONS, <br />Construction Quality Assurance Plan, and the DRAWINGS. <br />1.02 SUBMITTALS: <br />A. CONTRACTOR shall provide the following information relating to the geomembrane <br />MANUFACTURER and INSTALLEA wi[h its proposal. <br />Information from the MANUFACTURER including company name, address. <br />telephone number, the names of the company president and quality control <br />manager, and narrative of the company history. <br />2. Information from the MANUFACTURER on factory size, equipment, personnel, <br />number of shifts per day, and capacity per shift. <br />3. Quality Control Manuals from the MANUFACTURER and INSTALLER for [he <br />installation and testing of the geomembrane, including [rial seams, seaming, <br />nondestructive testing, destructive [esting procedures, repair procedures and <br />in-field quality control forms. Upon review of the Quality Control Manuals, <br />MANAGER may request additional testing during the manufacturing process at <br />no additional cost to OWNER. The Quality Control Manuals shall become part <br />of the Contract document following MANAGER'S and CERTff-PING ENGINEER'S <br />review and acceptance. <br />4. A list of at least five completed facilities from the MANUFACTURER totaling a <br />minimum of 5 million (5,000,0001 square feet of the type of geomembrane that <br />is being installed at the Cresson Project. Each entry in this list should specify <br />the name and purpose of the facility, its location and date of installation, the <br />name of the owner, the project manager, designer, fabricator (if any), and the <br />geosynthetics installadort contractor and the name and telephone number of the <br />contact at the facility who can discuss the project. In addition, the <br />geomembrane thickness and total square footage of the installation surface <br />should be included. <br />5. Installation capabilities of the INSTALLER. <br />6. Information on equipment and pr:rsannel from the INSTALLER, <br />7. A list of at least five completed facilities, totaling five million (5,000,000) <br />square feet for which INSTALLER has installed the type of geomembrane that <br />is being installed at the Cresson Project. For each installation, the following <br />information shall be provided: <br />March 28, 1996 Section 02776.0 <br />02778,0-1 Geamemhrane <br />Revision 4 <br />