the geomembrane. If damage occurs, it shall be repaired by CONTRACTOR prior to the <br />completion of backfilling, at no cost to OWNER. <br />C. Extend geomembrane into the anchor trench as shown in the DRAWINGS. The <br />geomembrane shall be seamed along the entire distance of the anchor trench. <br />3.04 PROTECTION: <br />CONTRACTOR shall be responsible for the following: <br />A. Do not use equipment or tools which damage the geomembrane by handling, <br />trafficking, excessive heat, leakage of hydrocarbons, or other means. <br />B. Ensure prepared surface underlying geomembrane has not deteriorated since previous <br />acceptance, and remains acceptable until acceptance by OWNER, as detailed in Section <br />3.02. <br />C. Keep geotextile elements immediately underlying the geomembrane clean and free of <br />debris. <br />0. Do not permit personnel to smoke or wear damaging shoes while working on <br />geomembrane. <br />E. Unroll panels in a manner which prevents scratches or crimps in geomembrane and <br />does not damage supporting soil. <br />F. Place panels in a manner that prevents wrinkles (especially differential wrinkles between <br />adjacent panels). <br />G. Prevent wind uplift and damage to geomembrane subgrade by providing temporary and <br />permanent loading andlor anchoring that will not damage geomembrane. <br />H. Minimize direct contact of equipment and personnel with geomembrane. <br />Protect geomembrane in areas where excessive traffic is expected with geotextiles, <br />extra geomembrane, or other materials acceptable to MANAGER, DESIGN ENGINEER <br />and CERTIFYING ENGINEER. <br />3.05 FIELD PANEL DEPLOYMENT: <br />A. CONTRACTOR shall install field panels at locations indicated on CONTRACTOR'S layout <br />plan, as approved by MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER. <br />8. CONTRACTOR shall replace damaged li.e., torn, twisted, ar crimped) field panels, ar <br />portions thereof, at no cost to OWNER. CONTRACTOR shall repair less serious damage <br />according to Article 3.10 of this Section, at na cost to OWNER. MANAGER and <br />CERTIFYING ENGINEER shall determine if material is to be repaired or replaced. <br />C. CONTRACTOR shall remove damaged panels, portions of damaged panels, and other <br />geomembrane scrap. <br />D. CONTRACTOR shall not deploy mare geomembrane field panels in one day than can <br />.. be seamed during the day of deployment. <br />March 26, 1996 Section 02776.0 <br />02776.0-15 Geomembrane <br />Revision 4 <br />