Laserfiche WebLink
<br /> <br />Table TR33-2. Regrade Calculations for Access and Haul/Wald Road. <br />Haul/Walk Road <br />Length of standard cut portions 2300 feet <br />Unit regrade volume (see Figure A-28 in permit) 45.7 cyd/ft <br />Regrade volume - road cuts 114250 cyds <br />Length of standard fill portions 2000 feet <br />Unit regrade volume (see Figure A-26 in permit) 23.1 cyd/ft <br />Regrade volume - road fills 46200 cyds <br />Length of average cut and fill 3903 feet <br />Unit regrade volume (see Figure A-24 in permit) 5.4 cyd/ft <br />Regrade volume - average cut and fill 21076 cyds <br />Total road length 8403 feet <br />Total regrade volume (in-place) 181526 cyds <br />Loose volume of regrade material 217831 cyds <br />Push distance 58 feet <br />Productivity 1600 lcy/hr <br />Unadjusted time 136.1 hrs <br />Performance correction factor (f rom PR-1) 0.74 <br />Adjusted time 183.9 hours <br />Regrade rate (from PR-1) $149.34/hr <br />Regrade cost $27,463.63 <br />Access Road <br />Length of new portion of road 14,632 feet <br />Unit regrade volume 8.2 cyd/ft <br />Total in-place regrade volume 119,982 cyd <br />Loose volume of regrade material 143979 cyd <br />Push distance 35 feet <br />Productivity 2480 lcy/hr <br />Unadjusted time 58.1 hours <br />Performance correction factor (from PR-1) 0.74 <br />Adjusted time 78.5 hours <br />Regrade rate (from PR-1) $149.34/hr <br />Regrade cost $11,723.19 <br />Total Regrade Cost $39,186.82 <br />HBH/CRF/jb 5/87 <br />