My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106219
DRMS
>
Back File Migration
>
Revision
>
REV106219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:54 AM
Creation date
11/22/2007 1:32:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
4/23/1987
Doc Name
TR33 CONSTRUCTION OF NEW ASHMORE PIT HAUL DRAGLINE WALK ROAD & ASSOCIATED ACCESS ROADS
From
TRAPPER MINING INC
To
MLRD
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Table TR33-2. Regrade Calculations for Access and Haul/Wald Road. <br />Haul/Walk Road <br />Length of standard cut portions 2300 feet <br />Unit regrade volume (see Figure A-28 in permit) 45.7 cyd/ft <br />Regrade volume - road cuts 114250 cyds <br />Length of standard fill portions 2000 feet <br />Unit regrade volume (see Figure A-26 in permit) 23.1 cyd/ft <br />Regrade volume - road fills 46200 cyds <br />Length of average cut and fill 3903 feet <br />Unit regrade volume (see Figure A-24 in permit) 5.4 cyd/ft <br />Regrade volume - average cut and fill 21076 cyds <br />Total road length 8403 feet <br />Total regrade volume (in-place) 181526 cyds <br />Loose volume of regrade material 217831 cyds <br />Push distance 58 feet <br />Productivity 1600 lcy/hr <br />Unadjusted time 136.1 hrs <br />Performance correction factor (f rom PR-1) 0.74 <br />Adjusted time 183.9 hours <br />Regrade rate (from PR-1) $149.34/hr <br />Regrade cost $27,463.63 <br />Access Road <br />Length of new portion of road 14,632 feet <br />Unit regrade volume 8.2 cyd/ft <br />Total in-place regrade volume 119,982 cyd <br />Loose volume of regrade material 143979 cyd <br />Push distance 35 feet <br />Productivity 2480 lcy/hr <br />Unadjusted time 58.1 hours <br />Performance correction factor (from PR-1) 0.74 <br />Adjusted time 78.5 hours <br />Regrade rate (from PR-1) $149.34/hr <br />Regrade cost $11,723.19 <br />Total Regrade Cost $39,186.82 <br />HBH/CRF/jb 5/87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.