Laserfiche WebLink
<br /> <br />Tab 1e TR33-1. Bond Summary for North Ashmore Pit Haul/Walk Road and <br />Associated Access Roads. <br />Activity Cost <br />Regrade $ 39,186.82 <br />Topsoil Replacement 81,019.63 <br />Revegetation 10,064.86 <br />i <br />Subtotal $130,271.31 <br />Indirect Costs: <br />Public Liability Insurance (0.8%) 1,042.17 <br />Contractor Performance Bond (0.7%) 911.90 <br />MLRD Administrative Expense (S%) 6,513.57 <br />Contractor Prvfit (10Y,) 13,027.13 <br />Contractor Superintendent 5,760.00 <br />(192 hrs @ $30/hr includes vehicle) <br />Subtotal $ 27,254.77 <br />Total $157,526.08 <br />HBH/CRF/jb 5/87 <br />