Laserfiche WebLink
-~ • <br />January 7, 1987 <br />Page 6 <br /> <br />Seeding will be completed prior to the first growing season after <br />resoiling is complete. <br />Reclamation will be concurrent with mining after the initial cut; <br />as additional acreage is disturbed an equal number of acreage <br />will be reclaimed. 6.20 acres + of the disturbed acreage will be <br />in some state of reclamation before being released. Reclamation <br />in each phase will be completed within five years of completion <br />of each mining stage. <br />Reclamation costs for this maximum area are based on the follow- <br />ing data: <br />Per Acre <br />1. Backfill and reshaping, 20 hrs @ $60/hr $1,200.00 <br />2. Final grading or ripping, 6 hrs @ $50/hr <br />3. Grass seed mixture, 26.4 lbs/acre @ $5/lb <br />Fertilizer based on soil test deficiencies - <br />Mulch <br />Labor, 16 man-hrs/acre @ $6/hr <br />300.00 <br />132.00 <br />- 20.00 <br />105.00 <br />96.00 <br />$ 353.00 <br />4. Seed mixture drilling or broadcasting and <br />fertilizing, 2.5 hrs @ $40/hr <br />5. Trees and shrubs, <br />Labor, 16 man-hrs/acre @ $6/hr <br />100.00 <br />292.00 <br />96.00 <br />$ 388.00 <br />Thus, reclamation costs for the combined acreage are as follows: <br />1. Backfill and reshaping,~V~~ acres X $1,200/acre $20,520.00 <br />2. Final grading and/or ripping, <br />23.3 acres X1 $300/acre 6,980.00 <br />3. Revegetation - grass, mixture, trees, fertilizer, <br />mulch, labor 23.3 acres X $353/acre 8,224.90 <br />4. Seed mixture drill or broadcast and fertilizing <br />23.3 acres X $100/acre 2,330.00 <br />5. Trees, Shrubs and Labor, 23.3 acres X $388/acre 9,040.40 <br />$47,105.30 <br />