My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106084
DRMS
>
Back File Migration
>
Revision
>
REV106084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:46 AM
Creation date
11/22/2007 1:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980245
IBM Index Class Name
Revision
Doc Date
1/8/1988
Doc Name
TR application TO MLRD PN 80-245 HOGBACK MINE
From
ROBINSON BRICK CO
To
MLRD
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ~. <br />January 7, 1987 <br />Page 2 <br /> <br />Figures 3A and 3B - These figures show the second step in <br />Stage 2 where the remaining clay to be mined is removed and <br />the mined area backfilled to its final contour. <br />Mining of the second step of Stage 2 will not commence until min- <br />ing in Stage 3 is complete. Mining in Stage 3 and the second <br />step of Stage 2 will progress to the north and south respectively <br />in the same manner as stated in the current permit. <br />The mining plan submitted with this TR shows 5 stages; a reduc- <br />tion from the 11 stages shown in the current mining plan. This <br />was done for simplification. Because reclamation will be concur- <br />rent with mining, the total area being disturbed at any one time <br />(after Step 1 of Stage 2 is completed) will vary only a small <br />amount. The current pit will progress from Stage 1 to the north <br />into Stage 3 to the permit boundary. As new areas are disturbed, <br />a like area will be reclaimed in the mined out area. When mining <br />is completed in Stage 3, overburden from Step 2 of Stage 2 and/or <br />from the overburden stockpile will be used to complete the final <br />backfill of Stage 3. The same process would occur as mining pro- <br />gresses to the south into Step 2 of Stage 2. Due to the addition <br />of Step 1 of Stage 2 and because of the many variables (brick <br />markets, clay characteristics, clay seam thicknesses, etc.), a <br />set timetable would be very difficult to maintain. Mining of <br />this mine should take 20 to 30 years. The location and advance <br />of the pit and mined areas can easily be shown every year in the <br />annual report. <br />Based on the following table, the maximum disturbance at any one <br />time will not exceed 23.3 acres. <br />Stage 1 18.8 acres <br />Stage 2, Step 2 3.5 acres <br />Stage 3 1.0 acres <br />Total 23.3 acres <br />Stages 4 and 5 will only be disturbed if additional overburden or <br />soil is needed for the reclamation of the mining areas. <br />The Robinson Brick Company and the Soil Conservation Service have <br />been working together on the reclamation for this site for sev- <br />eral years. Based on SCS recommendations, test plots and <br />experience, a revision to the current reclamation plan is also <br />requested. <br />The main difference to the reclamation plan is that the terraced <br />slopes would be reduced to gradual 3H:1V slope. This will leave <br />a cliff face ranging from less than 10 feet to BO feet in height. <br />The average height would be less than 45 feet. At least two <br />locations, where the cliff height is greater than 60 feet, would <br />
The URL can be used to link to this page
Your browser does not support the video tag.