My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106084
DRMS
>
Back File Migration
>
Revision
>
REV106084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:46 AM
Creation date
11/22/2007 1:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980245
IBM Index Class Name
Revision
Doc Date
1/8/1988
Doc Name
TR application TO MLRD PN 80-245 HOGBACK MINE
From
ROBINSON BRICK CO
To
MLRD
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~ ROBINSON <br />BRICK ~ <br />COMPANY ~ <br />~ ~ ~ <br />~ ~ <br />January 7, 1988 <br />~~I I~~I~~~~~I~~~ ~~~ <br /> <br />JAN b iy~g <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203-2273 <br />M~Ntt, ~nU <br />~E~AMATION DIVISION <br />Re: Technical Revision to MLRD <br />Permit #80-245, Hogback Mine <br />Dear Sir: <br />This technical revision (TR) will address two items: a change in <br />the sequence of mining and a change in the reclamation plan. <br />The enclosed Map Exhibit D-1, dated December 15, 1987, shows the <br />~~ of stages of mining. <br />r, l.: yN <br />~ W Mining activities are currently located in Stage 1. The mining <br />plan as stated in the current plan will not change--mining with <br />concurrent reclamation will continue to the north through Stage 1 <br />and into Stage 3, and then go to the south. With the acceptance <br />of this TR, additional mining will start in Stage 2. <br />The mining in Stage 2 will be in two steps. The first step will <br />consist of the removal of about 30 feet of clay. Mining in this <br />stage will begin at the northern portion of this stage and pro- <br />ceed to the south and will include backfilling of the steeply <br />dipping open-stopes. This step will be concurrent with the min- <br />ing activities in Stages 1 and 3. The second step of Stage 2 <br />will commence after all mining is completed in Stage 3. <br />To illustrate this two-step procedure in Stage 2, refer to the <br />following cross-sections: <br />1 Figure lA and 1B - These figures show typical cross- <br />` sections in Stage 2 based on the current topography. <br />Figures 2A and 2B - These figures show the first step of <br />mining where the upper portions of clay will be removed and <br />the waste material will be used to backfill the open stopes. <br />This will leave a highwall ranging from 20 feet to 50 feet; <br />the average being 30 feet. The area being mined in this <br />step consists of rock outcrops and open stopes so that there <br />will be no topsoil to salvage. <br />P.O. Box 5243 • 1845 West Dartmouth • Denver, Colorado 80217-5243 • (303) 781-9002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.