My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105936
DRMS
>
Back File Migration
>
Revision
>
REV105936
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:17:58 AM
Creation date
11/22/2007 1:30:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978011
IBM Index Class Name
Revision
Doc Date
2/2/1990
Doc Name
ADEQUACY REVIEW BUFFALO 1 MINE CONVERSON FN M-78-011
From
MLRD
To
GAMBIT INC
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii uiiiiiiiiiu iii • <br />STATE OF COLORADO <br />~ MINED LAND RECLAMATION DIVISION <br />i <br />Department of Natural Resources <br />' 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> 303 866-3567 <br />~~ ' Fq x: 303 832-8106 <br />l~J <br /> <br />IJ <br /> <br />1 <br />OF~~`~`~lp <br />e~~%siul~'~910 <br />N <br />`M~~~ <br />~' <br />~ /eJ6 ~ <br />Ray Romer, <br />Governor <br />Fretl R. Rama, <br />Division D`.recior <br />DATE: February 2, 1990 <br />T0: Bradford Janes - Gambit, Inc. <br />FROM: Gregg R. Squire, Reclamation Specialist <br />RE: Adequacy Review: Buffalo No. 1 Mine Conversion, File No, M-78-011 <br />The following items must be addressed by the applicant in order to satisfy the <br />applicable requirements of C.R.S. 34-32-101 et seq, and the Mineral Rules and <br />Regulations of the Mined Land Reclamation Board: <br />Permit Application Form <br />1. Item 9. "County" - The project is located in Elbert County. Please <br />correct. <br />' Exhibit C - Mining Plan Maps <br />1. For these maps to comply with C.R.S. 34-32-112(4) and Rules 2,1.2(2) and <br />(3 ), the following information should be shown: <br /> <br />a. The actual areas to be mined for clay and for topsoil; <br />b. All proposed water diversions and impoundments; <br />.\ <br /> <br /> <br /> <br />1 <br /> <br />r <br />c. All proposed overburden, material, and topsoil stockpile locations; <br />d. All mine related disturbances (please see Rule 1.1(2) - "Affected <br />land" definition and include the locations of disturbances; <br />e. All presently existing significant, valuable, and permanent <br />man-made structures and their names; <br />f. Phases of the mining process (see question number 5 under the <br />Mining Plan section) which are correlated with the phase <br />definitions in the mining plan; <br />g. Paragraph 18 of Exhibit D - Mine Plan states that "existing draws <br />will be crossed at limited locations,. and that all other mine <br />related activities wilt maintain a 50 foot vegetated buffer from <br />the bank full stage of the draws." The planned crossing areas and <br />the 50 foot buffer areas must be shown on the Mining Plan Maps. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.