Laserfiche WebLink
It is planned that operations will begin in Area A as indicated on Pre-Mining and <br />Mining Plan Map Exhibit C. This operation is expected to be a dry mining <br />operation. <br />The gravel will first be ripped with a dozer and either pushed directly into a stock <br />pile or loaded with afront-end loader into haul trucks for transportation to roads in <br />the surrounding area for road repair. It is anticipated that the site will be mined less <br />than two hundred (200) days per year. <br />Processing <br />No processing will occur on the site. <br />Phases of Mining and Reclamation <br />The mining operation will begin following issuance of the permit. It is anticipated <br />that only 5-9.0 acres will be mined a time. Reclamation will begin concurrently, the <br />life of the operation is estimated to be about 25 years, more or less. <br />