Laserfiche WebLink
BOND RELEASE APPLICATION <br />SOUTHFIELD LOADOUT FACILITY <br />Page 2 <br />SUMMARY <br />Reclamation activities completed at the Loadout Facility, which are the basis for this Phase I <br />bond release request, are listed below in order of completion on Table 1, Reclamation <br />Summary. <br />TABLE 1 <br />RECLAMATION SUMMARY <br />Period Reclamation Activity Completed <br />Area/ Volume <br />7/96- Coal stockpiles and base materials removed and hauled <br />10/96 to Southfield Mine site. <br />9/96- Coal fines hand leaned from existing railroad tracks. <br />l0/96 <br />9/96- Backfill, grade, and establish drainage controls at the <br />11/96 Loadout Facility. <br />n/a <br />n/a <br />14.5 acres/ <br />38,500 ccy <br />