Laserfiche WebLink
EXHIBIT E <br />RECLAMATION PLAN AND TIMETABLE <br />No changes are planned in the reclamation plan, reclamation standards <br />or vegetation program, except for leaving a pad at completion of <br />reclamation within the area of Phase 11. The slopes of this pad area <br />will be cut back to a maximum slope of 2:1, to be benched and <br />revegetated in the same manner as the rest of the disturbed area <br />along the hogback. This pad will be left in place of the waste <br />stockpile that was planned in the original application. <br />RECLAMATION TIMETABLE <br />The reclamation will immediately follow each mining stage except Phase <br />9 for which mining stages 7, 8, 9 and 10 must be completed first. There <br />should be no more than a four year lag between the completion of <br />the mining stage and the reclamation of the previous reclamation phase <br />(i.e., when Stage 2 of mining is completed, the reclamation of Phase 1 <br />will be within 4 years). <br /> TOTAL ACRES DISTURBED <br />PHASE YEARS MINING BUFFER <br /> <br />1 2-4 1.29 <br />2 2-4 1.29 <br />3 2-4 1.29 <br />4 2-4 1.29 <br />5 2-4 1.29 <br />6 2-4 2.08 1.21 <br />7 2-4 2.08 1.21 <br />8 2-4 6.72 7.03 <br />9 2-4 11.73 5.36 <br />10 2-4 8.03 <br />11 2-4 6.06 <br />Access Road 7,g5 <br /> 22-44 45.05 2.087 <br /> <br />