Laserfiche WebLink
MINING TIMETABLE <br />'fhe following timetable is based on the best projected estimate of <br />future demand. Any economic change from the norm can, and will, <br />radically change all of the timetable estimates. <br />STAGE YEARS TOTAL ACRES EST. YD. CLAY <br />1 2-5 25.10 40,400 <br />2 2-4 3.31 23,000 <br />3 2-4 3.31 23,000 <br />4 2-4 3.25 23,000 <br />5 2-4 3.14 23,000 <br />6 2-4 2.76 23,000 <br />7 2-4 11.90 23,000 <br />8 2-4 1.95 23,000 <br />9 2-4 1.42 23,000 <br />10 2 1.82 17,200 <br />Road 7.95 8,600 <br /> 20-39 65.91 250,200 <br />