My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105467
DRMS
>
Back File Migration
>
Revision
>
REV105467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:17:12 AM
Creation date
11/22/2007 1:26:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
4/10/2000
Doc Name
APPLICATION FOR AMENDMENT TO AN EXISTING CONDITIONAL USE PERMIT-MINING
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
TELLER CNTY PLANNING DEPT
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other required approvals for the activities addressed in this document are discussed under each <br />appropriate heading for the Teller County Land Use Regulations in Table 4 below. These <br />approvals will be obtained prior to beginning work which requires said approvals. <br />CC&V requests in this application approval of any structures or activities for which a building <br />(or other) permit is required under Teller County regulations, including, without limitation, the <br />Teller County Building Code, as they are in effect at the time of issuance of such permit(s). <br />Upon proper and complete application and payment of the applicable fees, building, <br />construction, septic, and/or other permits shall be issued, it being the intention of the County that <br />all zoning compliance preconditions to the issuance of such permits have been satisfied by the <br />approval of this amendment application, with all remaining requirements for the issuance of <br />building, construction, septic, and/or other permits being administrative and ministerial only. <br />Section 3.7 of the proposed CCMOD regulations includes the requirement to obtain <br />OMLR/MLRB approval prior to commencing activities. Section 3.9 of the proposed <br />CCMOD regulations includes the requirement to provide notice related to other required <br />approvals. CC&V will inform Teller County of "any required permit or approval, <br />amendment or technical revision, from a regulatory agency other than Teller County that has <br />been granted, denied, revoked or suspended, within 30 days of such action," where the action <br />concerns a matter relevant to the regulations for the CCMOD. Finally, Section 3.5 of the <br />proposed CCMOD regulations, require submittal of annual reports; CC&V will submit to <br />Teller County a copy of the annual report filed with the OMLR <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.