Laserfiche WebLink
Mr. Thomas A. Schreiner -Page Six <br />January 20, 2006 <br />18. Re: Proposed water well and septic system at Mount Royale No. 1 Adit <br />portal area. <br />To date, MRV has not advanced the concept of water well and septic system <br />installation at the Mount Royale No. 1 Adit area beyond the incorporation of a <br />provision to do so within the Amendment application. As such, at this time MRV <br />is of the opinion that demonstration of appropriate permits, etc. is not a valid <br />actionable item with respect to conditional approval of the Amendment <br />application. Investment in significant infrastructure cannot be justified until such <br />time that all necessary operating permits are obtained. <br />MRV will commit to submittal of appropriate design and construction information <br />via Technical Revision at such time that MRV elects to move forward with <br />installation of the groundwater well and/or septic system. Concurrent with this, <br />applicable and appropriate State of Colorado and Boulder County permits will be <br />pursued and evidence thereof provided to the Division. <br />MRV trusts that the foregoing responses address all outstanding issues or concerns with <br />respect to the Cash Mine Amendment No. 2 application. If additional information is <br />required, please do not hesitate to contact me directly. <br />Sincerely, <br />`rn~-- ~- <br />Mark A. Steen <br />(for) MOUNT ROYALE VENTURES, LLC <br />