Laserfiche WebLink
Mr. Thomas A. Schreiner -Page Five <br />January 20, 2006 <br />future access by MRV may or will occur, these shafts will be maintained in their <br />present status. <br />The St. Joe shaft has not been utilized or affected since 1983. As per the <br />Amendment application, it is anticipated that the shaft will be utilized as a future <br />escapeway when workings extend to that area. As such, the shaft will be <br />maintained in its present status. <br />The Donald R. Adit has been utilized subsequent to 1983. The adit portal <br />consists of a corrugated steel pipe extending outward from the crown area. A <br />locked, steel gate (bat accessible) is currently in place, with a secondary <br />concrete and steel gate within the mine also in place. Its closure/maintenance <br />method is consistent with MSHA safety requirements. Further, the adit entrance <br />was inspected by the Division prior to initiation of recent prospecting programs at <br />the site. Inasmuch as future access by MRV may or will occur, the adit will be <br />maintained in its present status. <br />The Belleview Adit is an approximately 1,000-ft. long deadend drift with an open <br />portal. It has not been utilized or affected subsequent to 1983. However, MRV <br />will commit to implementing closure of this feature within 75 days of conditional <br />approval of the Amendment. The anticipated closure method would consist of <br />full cross-section placement of inert waste rock to a distance of approximately <br />25-ft. inby of the portal. This closure methodology is selected since future <br />access by MRV may occur. The adit feature is not visible or directly accessible <br />from public roadways and is situated on private property that is posted "no <br />trespassing." <br />The Mount Royale No. 1 Adit is the primary operational adit at the site. It is <br />equipped with a locking steel door consistent with MSHA safety requirements. <br />Provision for closure is already incorporated into the Amendment application and <br />associated bond cost estimate. <br />The Mount Royale No. 2 Adit does not yet exist and there is no definitively <br />scheduled date for its construction. At such time MRV elects to construct this <br />adit, closure methodology and associated bond cost estimate with be addressed <br />through a separate Technical Revision. <br />17. Re: Zero discharge status and UIC permit considerations. <br />As stated previously, MRV will maintain a "zero-discharge" facility by routing (to <br />the extent necessary) minor quantities of underground water to sumps <br />constrained within the underground workings. As such, MRV does not anticipate <br />the applicability of, or the requirement for, a UIC permit to conduct the limited <br />underground water management activities. <br />