Laserfiche WebLink
<br /> <br />EXHIBIT L <br />reclamation cost <br />Following is an estimate of reclamation costs <br />ITEM DESCRIPTION <br />1 Mobilization < 45 mi. <br />2 Backfill Slope <br />3 Backfill Floor <br />4 Ripping <br />5 Finish Grading <br />6 Top Soil Replacement <br />7 Structural Demo. & Removal <br />8 Concrete Demo. & Removal <br />9 Seeding <br />10 Herbicide <br />subtotal <br />UNIT QUAN. UNIT TOTAL <br />LS $2, 000 <br />CY 1,376,100 $1. 00 $1,376,100 <br />CY 116,400 $0. 80 $993,120 <br />AC 4 $250. 00 $1, 000 <br />AC 46 $250. 00 $11,500 <br />CY 37, 000 $0. 50 $18, 555 <br />LS $10,000 <br />CY 1,250 $3. 00 $3,750 <br />AC 46 $750. 00 $34,500 <br />LS $4, 000 <br />11 Contingency <br />GRAND TOTAL <br />NOTE : See following page for grading calculations. <br />1.554.525 <br />$233,179 <br /> <br />P- 1 <br />