My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104845
DRMS
>
Back File Migration
>
Revision
>
REV104845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:16:17 AM
Creation date
11/22/2007 1:21:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
3/7/1997
Doc Name
MEMO ROADSIDE PORTALS PN C-81-041
From
DMG
To
ERICA CROSBY
Type & Sequence
TR22
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />\\ <br />00 <br />m~ <br />.~ <br />A <br />o Z <br />n <br />0 <br />r <br />° O <br />3 <br />_ D <br />~~ <br />z <br />0 <br />~ ~ <br />~ I <br />3 <br />0 <br />Z <br />'J <br />,+ <br />3 <br />~+ <br />rti <br />F <br />ru <br />r'U <br />ilJ <br />v <br />Pond 12 X-sections <br />A-A' B-B' <br />.pp1' <br />~. ~r...eoew / <br />~6'3GVC Cn.~p.nCY spni.Or - ~Bp26' / ~ <br />I\I ~ Cu.,x <br />moo. ~ a.w.r pu.vy - .eaa~ - ~ ~ ? Corr <br />~~~ <br />,r, amp. <br />r <br />a~a , ~.:,~~ J.' <br />L ~,~ o, ~.po~.n.~. <br />Vsrapr <br />~ ErnbankrJent Construction Gu~del~nes <br />- Embankment founda ton area shalt be cleared of all organ;c mater;al. <br />- A cut off trench shall be excavated a minimum of 4' below the existing ground level nail 4' ;nto the s+de slopes. A <br />greater depth ray be necessary .f voids or loose mnter~nl are stall ev;dent. The bottom of the trench shall be <br />started at the centerUne of the embankment and extend 10' upstream. S;des of the cut shall have a mnx;mum <br />slope of Ih Iv <br />- The foundation area shall be scac~f~ed n m;n~mum of 6' deep and compacted to 95% of the mnter;nl's mn x;mum dry <br />dens;ty. Water shntl be nddeG as necessary to achieve proper compaction. <br />- The Fill ma ter;nl shalt be n day-max sort free from vegetn t~~on, frozen mnter;nl, or large amounts of dean sand, <br />grovel or silt. The fall shall not contain any rocks larger than 6' .n d~nmeter. <br />- The Fall shall be mixed, spread ;n 6' max;mum efts nail compacted to 95% of the materml's max;mum dry dens;ty. <br />Water shall be added as necessary to achieve proper- compaction. <br />< s <br />o <br />- The spillways shau be ~nstnlted nt approximately the ex;sting ground level. A cut oFfcollnr Ca p;ece of conveyor <br />o ;' belt opprox~mntely 18" square with n tight Flt ting hole cut .n the center) shall be placed on the p;pe near the <br />w center Lr~e of the embankment Spec;al care shall be taken to ach;eve proper- compnct;on around the p;pes nail the <br />~ - cutoFF collars. A valve will be ~nstatled on the pr;mary spillway below the Frost level. <br />_ N <br />
The URL can be used to link to this page
Your browser does not support the video tag.