My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-18_REVISION - M1985022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985022
>
2007-09-18_REVISION - M1985022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:39 AM
Creation date
11/22/2007 1:21:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985022
IBM Index Class Name
Revision
Doc Date
9/18/2007
Doc Name
Cost summary form
From
American Gypsum Company
To
DRMS
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />'ROJECT IDENTIFICATIt <br />Task # : 001 <br />Date : 09/11/2007 <br />User : KAP <br />State :Colorado <br />County :Park <br />Site : Bullger Basin Placer <br />Agency or organization name :Colorado Division Of Reclamation Mining And <br />Permit or other job action :Bond Recalculation Relative to Inspection <br />Task description :Grade all slopes to 3:1 <br />HOURLY EQUIPMENT COST <br />Rock <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosUhour : $409.06 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 136,500 CCY factor : 1.165 volume : 159,022 LCY <br />Source of estimated volume <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 50% Rock; <br />Basic machine :Cat D9R - 9SU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />30.00 % (r <br />12,300 feet <br />2,900 Ibs/LCY <br />Job Condition Correction Factors <br />Operator skill :_ <br />Material consistency <br />Dozing method <br />Visibility :_ <br />Job efficiency <br />Spoil pile <br />~, Push gradient: <br />Altitude '. <br />Material weight <br />Blade type <br />Net correction <br />Source <br />HB) <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.60 <br />0.87 <br />0.79 <br />1.00 <br />0.55 <br />50% Earth <br />JOB TIME AND COST <br />Adjusted unit production : 500.81 LCY/hr <br />Adjusted fleet production : 1,001.62 LCY/hr <br />Permitlob# : M-1985-022 <br />Abbreviation :none <br />Filename : M022-001 <br />Fleet size : 2 Dozers) Total job time : 158.77 Hours <br />Unit cost : $0.408 /LCY Total job cost : $64,945 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.