boundary was previously mined, reclaimed, and released. Therefore, mining has taken place <br />right up to the eastern permit boundary (see Current Conditions, Exhibit C-1) and the area is <br />currently being backfilled for reclamation. Along the proposed southern amended permit <br />boundary, mining has taken place under the existing Kauffinan Pit permit (M-78-327). South of <br />the proposed permit boundary, backfilling of the pit is currently taking place for reclamation <br />under the Kauffinan Pit permit and will continue to include the reclaimed southern azea of the <br />proposed Wagner/Kauffman Pit #3 permit area. <br />Mine Phasing <br />The eastern most portion of the proposed amended permit azea, owned by Flying W Ranch <br />Loveland, LLC, will remain Phase I of the operation under the proposed amendment. The <br />mining area of Phase I, including approximately 41 acres, has already been mined and is <br />currently being backfilled. This area will be seeded as backfilling operations are completed. <br />Phase II of the original mining permit included approximately 74 acres west of the Fly W Ranch <br />property (Phase I) and east of the Boyd Lake Outlet Ditch. The amended mining area of Phase II <br />will also include approximately 62 acres south of the original permit azea and north of the Big <br />Thompson River. The 62 acres is currently part of the permitted Kauffinan Pit extraction <br />operation (M-78-327). The 136 acres of Phase II (the original 74 acres and the amended 62 <br />acres) are currently being mined from the southeast to the northwest. Topsoil and overburden <br />from Phase II will continued to be stockpiled within the pit and used for backfilling of Phase I <br />and reclamation of Phase II. With the amended mining azea, Phase II is expected to take <br />approximately 5 to 6 more yeazs to complete. <br />The western most portion of the original permit azea, west of the Boyd Lake Outlet Ditch, will <br />remain Phase III of the mining operation. The Phase III mining azea consists of approximately <br />35 acres and has yet to be mined. Topsoil and overburden material from this phase will be <br />placed in backfill azeas of Phase II and used for Phase III reclamation. It is expected to take 4 to <br />5 yeazs to complete the mining in this phase, progressing from west to east. <br />Mining Methods <br />The sand and gravel deposit will continue to be dry mined. Trenches and pumps will be used to <br />dewater the deposit within each mining azea prior to mining below the water table. Dewatering <br />trenches will be excavated around the perimeter of each mining area prior to mining and pumps <br />will be used to remove the water that drains from the deposit and surrounding alluvium into the <br />trench. If necessary, water from the trenches will be circulated through a settling basin to meet <br />applicable Colorado Discharge Permit System requirements prior to it being dischazged to the <br />Big Thompson River. <br />The aggregate material will be recovered using equipment and facilities typical for sand and <br />gravel mining operations. The resource will continue to be hauled off-site and processed on the <br />remaining permitted property of the Kauffinan Pit (M-78-327), which is also held and operated <br />by the applicant. The equipment used for mining operations may include, but aze not limited to, <br />dozers, loaders, scrapers, excavators, and compactors. <br />Jake Kauffman and Son, lnc. -Wagner/Kauffman R't <br />OMG !!2 Permit Amendment <br />Page 5 <br />