My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104665
DRMS
>
Back File Migration
>
Revision
>
REV104665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:16:03 AM
Creation date
11/22/2007 1:19:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/8/2005
Doc Name
2005 Midterm Review Memo
From
Byron Walker
To
File
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The PAP is on file at the Hayden Public Library. "Compliance" documentation, those documents <br />that change on a time schedule, are on file at the offices of Hydro-Environmental Solutions, Inc., <br />57 10th Street, Suite B, Steamboat Springs, Colorado. <br />Rule 2.07.6 Criteria for Review of Permit Applications for Permit Approval or Denial. <br />There are no known changed conditions that would alter the considerations for prior approval of <br />the permit. <br />Rule 2.08.1(1) Revisions to and affirmative periodic review of permits previously issued by the <br />Division, <br />This is a midterm review of Permit C-1992-081. <br />Rule 2.08.3(1) The Division shall review each permit issued and outstanding under these rules <br />during the term of the permit. This review shall occur not later than the middle of the permit <br />term and as required by 2.06.2 through 2.06.7, pertaining to experimental practices, <br />mountaintop removal, steep slope, and combined surface and underground mining. <br />The permit does not pertain to experimental practices, mountaintop removal, steep slope, and <br />combined surface and underground mining. This is a review of permit C-1992-081. <br />Rule 2.08.3(2) For permits of longer than S year terms, a review of the permit shall be no less <br />than the permit midterm or every S years, whichever is more frequent. <br />The permit term is for 5 years. <br />Rule 2.08.3(3) After this review, the Division may, for good cause shown, by order, require <br />reasonable revision or modification of the permit provisions to ensure compliance with the Act <br />and these Rules. <br />The applicant is asked to update or revise portions of the permit as a result of this rule. <br />Rule 2.08.3(4) Copies of the decision of the Division shall be sent to the permittee. <br />A copy of the midterm review will be sent to the applicant, along with a letter requesting required <br />actions. <br />Rule 2.08.3(5) Any order of the Division requiring revision or modification of permits shall be <br />based upon written f ndings and shall be subject to administrative and judicial review. <br />The midterm review is in the form of a findings, and is based on this memorandum. <br />Page 26 of 38 pages, November 8, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.