Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 012 <br />Date : 02/25/2003 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regrade Ramp Roads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 4,444 <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />OwnershipcosUhour : $53.00 NA <br />Operating cosUhour : $8721 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $24.01 NA <br />Total unit cosUhour : $164.22 Total fleet cosUhour <br />PermiUjob# : C-92-081 <br />Abbreviation :none <br />Filename : C081-012 <br />Swell Loose <br />BCY factor : 1.250 volume : 5,555 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUC710N <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacfetl fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.340 /LCY <br />Source <br />Operator skill : 0.75 (a~ <br />Material consistency : 0.90 (Cat <br />Dozing method : 1.00 (ge <br />Visibility: 1.00 (av <br />Job efficiency: 0.83 (lshit <br />Spoil pile : 0.80 (inc <br />Push gradient : 1.00 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.87 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.39 <br />Adjusted unit production <br />Adjusted fleet production <br />483.43 <br />483.43 <br />$164.22 <br />LCY/hr <br />LCY/hr <br />Total job time : 11.49 Hours <br />Total job cost : $1,887 <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />