My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104616
DRMS
>
Back File Migration
>
Revision
>
REV104616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:58 AM
Creation date
11/22/2007 1:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
2/26/2003
Doc Name
Adequacy Review & Cost Summary Form
From
DMG
To
Montgomery Watson Harza
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 011 <br />Date : 02/25/2003 <br />User : JRS <br />State :Colorado <br />County:Routt <br />Site :Hayden Gulch Loadout <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regrade Haul Roads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 5,370 <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />OwnershipcosUhour : $53.00 NA <br />Operating cosUhour : $8721 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $24.01 NA <br />Total unit cosUhour : $164.22 Total fleet cosUhour <br />Swell Loose <br />BCY factor : 1.250 volume <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decompcsed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.340 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />PermiUjob# : C-92-081 <br />Abbreviation :none <br />Filename : C081-011 <br />Total job time <br />Total job cost <br />Horsepower: 405 <br />Shitt basis : 1 per day <br />Data source : (CRG) <br />$164.22 <br />6,712 LCY <br />rrs Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshifUday <br />0.80 (fnd-A) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.87 (Cat HB) <br />1.00 (S/SU/U) <br />0.39 <br />483.43 LCY/hr <br />483.43 LCY/hr <br />13.89 Hours <br />$2,280 <br />
The URL can be used to link to this page
Your browser does not support the video tag.