My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104535
DRMS
>
Back File Migration
>
Revision
>
REV104535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:51 AM
Creation date
11/22/2007 1:18:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
8/29/2002
Doc Name
Adequacy letter
From
DMG
To
Trapper Mining Inc
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or institutional building either: <br />(a) not located in the pemvt azea; or <br />(b) not owned or leased by Trapper Mining Company." <br />14. To more accurately reflect the requirements of Rule 4.08.5(5), please update existing sentence <br />No. 5 on TMI permit page 3-32 to state, "Weather conditions, including temperature, wind <br />direction, and approximate velocity." <br />15. To acknowledge the requirements of Rule 4.08.5(8), please update the TMI permit by adding a <br />new sentence No. 13 to permit page 3-36 that states, "If holes aze decked to achieve different <br />delay times within a hole, sketches will also show decking." <br />16. To acknowledge the requirements of Rule 4.08.5(13), please update the TMI permit by adding a <br />new sentence No. 14 to permit page 3-36 that states, "Type and length of stemming." <br />17. To acknowledge the requirements of Rule 4.08.5(14), please update the TMI permit by adding a <br />new sentence No. 15 to permit page 3-36 that states, "Mats or other protection used." <br />18. To acknowledge the requirements of Rule 4.08.5(16), please update the TMI permit by adding a <br />new sentence No. 16 to permit page 3-36 that states, "Number of persons in blasting crew." <br />19. To acknowledge the requirements of Rule 4.08.5(17), please update the TMI pernut by adding a <br />new sentence No. 17 to permit page 3-36 that states: <br />"Airblast records, including: <br />(a) type of instrument, sensitivity, and certification of annual calibration; <br />(b) exact location of instrument and the date, time and its distance from the blast(s); <br />(c) name of the person and firm taking the reading; <br />(d) name of the person and finrl analyzing the blast monitoring record; <br />(e) the airblastlevel recorded." <br />Hydrology <br />20. To improve clarity of the PHC, please add to page 4-238f across-reference to the discussion of <br />well impacts that is on pages 4-226a through d. (An alternative would be to restmcture the text <br />so that all discussions of predicted impacts to wells appeaz in one place in the PHC.) <br />21. Please add to the PHC, a prediction of impacts to the Musgrave well (Division of Water <br />Resources permit no. 151991) <br />C-1981-010 RN04/PROS 6 08/29/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.