Laserfiche WebLink
~r • <br />,K ~ <br />Colorado ML RD has prepared a mid-term review analysis and identified <br />portions of the permit which need to be revised in order to bring the <br />mine into compliance with the regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining. Grand Mesa Coal Company is required <br />to respond to the revisions outlined by Colorado MLRD within 60 days of <br />receipt of the mid-tens report. The permittee requested a two-week <br />extension for complying with the revisions, and Colorado ML RD agreed to <br />grant Grand Mesa Coal Company a two-week extension for submitting the <br />information. <br />OSMRE has determined that none of the required revisions constitute a <br />mining plan modification under 30 CFR 746.18(d). Based on the responses <br />of the Albuquerque Field Office, the BLM, Minerals Management Service, <br />and OSMRE/WFO's review, OSMRE/WFO has concluded that no revisions to the <br />permit are needed beyond those addressed by Colorado ML RD. <br />Atta~ch~ments <br />cc: V Colorado MLRD <br />BLM - Montrose District <br />Robert Hagen, Albuquerque FO <br />1134M <br />