My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-15_REVISION - M1986159
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986159
>
2002-05-15_REVISION - M1986159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:04 PM
Creation date
11/22/2007 1:16:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986159
IBM Index Class Name
Revision
Doc Date
5/15/2002
Doc Name
Preliminary Adequacy Review
From
DMG
To
Lafarge West Inc
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />May 2, 2002 <br />Mr. Eric Reckentine <br />6.4 SPECIFIC EXHIBIT REQUIREMENTS -REGULAR 112 OPERATIONS <br />6.4.1 EXHIBIT A - Lesal Descriation <br />This item appeass to meet the requirements of the Rules. <br />6.4.2 EXHIBIT B -Index Man <br />This item appears to meet the requirements of the Rules. <br />6.4.3 EXHIBIT C -Pre-minin¢ and Mining Plan Maas) of Affected Lands <br />This item appeass to meet the requirements of the Rules. The Exhibit C map is excellent. <br />6.4.4 EXHIBIT D - Minin¢ Plan <br />In the second sentence of this section the maximum depth of the deposit appeass to have a <br />typographic error. Please correct this for the finalized document. <br />Please refer to Phase IV as recently released, and Phase V as the area to be added in the <br />amendment both on the front and back of the sheet. <br />6.4.5 EXHIBIT E -Reclamation Plan <br />In your part 6.4 Topsoiling {1) third sentence the revegetation of topsoil stockpiles may <br />perform better with the addition of sideoats gramma to the western wheatgrass. <br />In your part 6.4 Topsoiling (7) Growing ... as possible. IJr0#... this should be translated, it <br />is appazently 40#/A. Please replace this page for the finalized document. <br />I am not clear on the Moderate & Minor Disturbance Timetable explanation. Please <br />clarify. <br />6.4.6 EXHIBIT F -Reclamation Plan Map <br />This item appeass to meet the requirements of the Rules. The map is excellent, and it is a <br />good idea to have the reclamation plan and cross section of the pipeline crossing on the <br />map. This should be helpful to the operators. <br />6.4.7 EXHIBIT G -Water Information <br />The third sentence that explains that the Bessemer Ditch is located 300 miles from the far <br />north comer of the permit area is probably a typo. Please correct this sheet for the <br />finalized document. <br />
The URL can be used to link to this page
Your browser does not support the video tag.