Laserfiche WebLink
• <br />• <br />Brannan Sand and Gravel Company <br />March 2, 1993 <br />Page 2 <br />The source of the water provided by the Fulton Ditch is diversions from the South <br />Platte River. Dry-up of acres historically imgated with the Fulton Ditch are described <br />in Notthglenn Case No. 79CW236: <br />You have provided monthly distribution for required water replacement. This <br />plan's total monthly replacement requirements in acre-feet are: <br /> <br />:. ~ <br />Month <br />-..Evaporative ; <br />lass <br />~ .Water ffi <br />Product <br />Total <br />'~~..I)eptmam -,. <br />at Rive: <br />. - (1stYear) ~~. x;s~ <br /> <br />- Use' ~ -- xaqu;roa ° :.. <br />Replaoemmt. ~. <br />- Waco <br />Jan 0.00 029 029 0.01 0.00 0.01 <br />Feb. 0.00 OS9 059 0.05 0.00 0.05 <br />Match 1.10 OS9 1.69 0.14 0.06 0.06 <br />Apnl 1.63 0.88 2S1 0.34 1.18 (0.84) <br />May 2.16 0.88 3.04 0.61 5.02 (4.41) <br />June 4.86 1.76 6.62 0.96 5.39 (4.43) <br />July 5.72 1.76 7.48 1.61 8.93 (732) <br />Augutit 5.72 1.76 7.48 228 7.39 (5.11) <br />Sept 454 059 S_13 2.76 2.67 0.09 <br />Oct. 3.01 OS9 3.60 2.84 0.67 2.17 <br />Nov. 1.61 029 2.10 2.67 0.04 2.63 <br />I7ec. 1.12 029 1.41 237 0.00 237 <br />Total 31.67 10.27 41.94 16.62 3135 (14.71) <br />In general, your proposed plan to replace depletions with consumptive use credits <br />from the Fulton Ditch does not provide replacement during all months when it is <br />needed even though the annual amount of replacement may be adequate. Because of <br />this timing deficiency, your plan may be approved as proposed for this year, however, <br />approval under the same conditions for subsequent yeazs will be unlikely. <br />Based on surplus Fulton Ditch water from the substitute water supply plan for <br />Brannan's Pit No. 27 (M75039) and 8 additional shares at 1.75 acre-feet per share <br />consumptive use. <br /> <br />